October Update: Finalist SEIS End-To-End Alternatives Introduced; Public Meeting Held (AKA: The Fog Lifts)

Addendum (12-24-2021): After so many years of absence, I have decided to restart this blog in lieu of some major updates in the progress of the I-49 Lafayette Connector freeway project. Future posts will reflect the progress of the Functional Corridor Study and the Supplemental Environmental Impact Statement (SEIS) processes that are currently ongoing. I have also made some minor edits to this particular blog post to correct some misspellings. Further posts are incoming. — AJK

A new milestone in the development of the I-49 Lafayette Connector project was fulfilled yesterday.

The LADOTD and the Lafayette Connector Partners (LCP) consultant group held an official Public Meeting last Thursday to officially introduce to the public the finalist End-to-End Refinement Alternatives that would be analyzed and vetted through the Supplemental Environmental Impact Statement (SEIS) process.

Essentially the final Refinement Alternatives will be down to comparisons of two options:

1) The Selected Alternative that was originally approved in the 2003 Final EIS/Record of Decision (ROD); and

2) a Base Refinement Alternative that was created and revised through the Tier II and Tier III Corridor Refinement Processes held during the previous 12 months; itself also broken down with 2 Subalternative designs.

The 2003 ROD Alternative is included only as a control for comparison purposes; the 2017 Refinement Alternative will be ultimately tweaked and revised into the final Supplemental Selected Alternative that will be approved through the SEIS process with a Supplemental ROD.

Here’s a full view of the original 2003 ROD Alternative (all graphics are screencapped from the official LADOTD/LCP Lafayette Connector website).

Full view from end to end of the originally approved 2003 EIS/ROD Selected Alternative alignment/design for the I-49 Lafayette Connector. This will be analyzed in the SEIS only for comparison purposes and will NOT be the final Supplemental Selected Alternative.

You can clearly see the main features of the original 2003 ROD alternative:

1) Three-level directional interchange at Kaliste Saloom Road;
2) Conventional slip-ramp diamond interchange at University Avenue/Surrey Street, dependent on displacement of Runway 11-29 at Lafayette Regional Airport as to adjust the runway’s glide path for aircraft approaches/landings/takeoffs;
3) Standalone Single Point Urban Interchanges (SPUI’s) at Johnston Street and a combined Second Street/Third Street couplet, with accompanying underpass grade separations of the BNSF/UP railroad mainline, for direct access downtown;
4) Incorporation of the existing Evangeline Thruway one-way couplet into the freeway frontage road system;
5) A slip-ramp Urban Diamond interchange at Willow Street, with “crossunder” connections under the elevated structure at Castille Avenue/Martin Luther King Drive and Donlon Avenue/Walmart Drive;
6) A higher than conventional vertical clearance (22 feet) along the downtown core area along the Sterling Grove neighborhood (which is a designated Historical District) in order to mitigate the visual impact on the district and surrounding neighborhood; and
7) A brief “dip” of fill section between Johnston and Jefferson streets to accommodate the downtown interchanges.

Due to the strong feedback by local officials who wanted major changes in the design, as well as providing for the changes in the environment and the general area since the 2003 ROD was issued; the Concept Refinement Process was initialized in January 2015 for the purpose of proposing changes and modifications to the design. The resulting three tiered process ended up producing first 19 alternative concepts and 6 series concepts for the central downtown core section, and 25 Potential Design Modifications throughout the corridor (Tier 1); which was reduced down to 4 proposed alignments using 2 series (Elevated and Partially Depressed, the latter split into Open Trench and Cut-and-Cover Tunnel suboptions). Further analysis during Tier II eliminated the Series 6 Partially Depressed option (much to the chagrin of many locals); and reduced the concepts down to two finalists:

Elevated with the existing Evangeline Thruway remaining in couplet form;

and

Elevated with the Thruway converted into a Grand Boulevard on its southbound ROW and the northbound ROW reverted into a local street.

Further analysis was undertaken involving local arterial street access and connectivity underneath the mainline Connector facility, revisions to avoid encroaching upon the LFT Runway 11-29 glide flight path made necessary by the revoking of the proposed displacement, and means to avoid further impacts to the Freetown-Port Rico neighborhood, which itself became a Historical District in 2015.

These new refinement alternatives and subalternatives reflect the consensus of the stakeholders and community in balancing the need for the Connector to handle the traffic logjam on the current Evangeline Thruway with the desire to maintain and improve connectivity and improve asthetics; and also upgrade multimodal access to include pedestrians and bicyclists.

The Base Refinement Alternative is shown below in full:

Proposed Base Refinement Alternative for I-49 Lafayette Connector freeway, reflecting the refinements and revisions developed through the tiered Concept Refinement Process.

The hatched blue segment at the southern end of the project reflects improvements that will be incorporated into the related US 90 interchange with Verot School Road; which will be designed and constructed separately from the Connector.

The primary features of the Base Refined Alternative are defined below.

1) The interchange with Kaliste Saloom Road is reduced in scope and design to a 2-level elevated Diverging T, where the cross movements meet at grade rather than are grade separated. This allows for a less expensive and visually less intrusive design, and also allows for adjusting the local connection roads between Kaliste Saloom Rd. and Hugh Walls Rd. to avoid encroaching a recently built motel and the Walls Estate property.

Revised Kaliste Saloom Road interchange under 2017 Base Refinement Alternative. Blue hatched segments are associated with the proposed US 90/Future I-49 South interchange with Verot School Road, which is a separate project.

2)  The University Avenue/Surrey Street interchange is moderately redesigned by depressing University/Surrey below its existing level by a maximum of 15 feet, adjusting the level of the frontage road system to connect with the lowered University/Surrey ROW, and reducing the vertical profile of the Connector mainline overpass of University/Surrey so that the current glide path for Runway 11-29 at LFT is not encroached. Pumping would be required during rainfall events at the University/Surrey underpass due to the proximity of the Vermilion River crossings of University and the Connector/Evangeline Thruway mainline/frontage system, and retaining walls will probably be necessary to accommodate businesses currently along the existing intersection.

Base Refinement Alternative showing revisions for the University Avenue/Surrey Street interchange.

3.)  The most significant change from the Tier II proposals is that the proposed connection ramps linking the Evangeline Thruway to the Connector are shifted completely out of the central core area. The north connection ramps I’ll get to shortly; but the south connection ramps, which formerly were placed to connect to the Thruway at Eleventh Street, have now been pushed well to the south to south of Pinhook Road. In addition, the ramps which would have been the north connection to University/Surrey have been shifted north to north of Pinhook Road, connecting with the Evangeline Thruway couplet system south of Taft Street.

The result: Pinhook Road now gets a full interchange with I-49.

Furthermore, the Pinhook Road intersection with the Thruway/Connector is improved by adding a displaced left turn segment from westbound Pinhook to southbound Evangeline Thruway, similar to what you would find in a continuous flow intersection. Adjustments and refinements are made to the local street system to accommodate these revisions; they have been tweaked a bit from the original proposals brought out in the September CSS meetings for improved local access.

Base Refinement Alternative design for the Pinhook Road interchange. The insert shows the Reduced Phase/Diverging Left Turn movement proposed for the intersection of Pinhook with the Evangeline Thruway. (Source: Lafayette Connector website)

4) The shifting of the downtown connection ramps out of the central core segment of the Connector greatly simplifies the design of the mainline; it simply “floats” on elevated structure through the corridor. The “tangent” section that straightens the ROW between Johnston Street and Jefferson Street away from the originally proposed sweeping curve is officially incorporated in the Base Refinement Alternative; as well as the realignment of the northbound Evangeline Thruway from Jefferson to Bellot Drive in order to shift it further away from the St. Genevieve Catholic Church and the Sterling Grove Historical District. The removal of the north connection ramps, originally proposed to connect to the Thruway north of Second Street, means that Simcoe Street and Mudd Avenue are no longer severed and can run continuous under the Connector ROW. Indeed, the current proposal basically keeps the status quo of the downtown street grid intact, save for the adjustments to the northbound Thruway.

Base Refinement Alternative Downtown core section. Inserts are the Subalternative (E-1 and M-1) modifications.

5) The Base Refinement Alternative includes the conversion of the Evangeline Thruway between Taft and Simcoe Streets into an urbanized Grand Boulevard centered on the southbound Thruway ROW. The current northbound Thruway in that section, and in the section orphaned through the realignment adjacent to Sterling Grove (Jefferson to Bellot), would revert to a local two-way street within the neighborhood street grid. As an alternative option, Subalternative E-1 is offered which would avoid the Grand Boulevard design and simply retain and improve the existing Thruway couplet, save for the northbound Thruway realignment from Jefferson to Bellot.

SubAlternative E-1, which would retain the existing Evangeline Thruway couplet.

In addition, due to the desire from locals (particularly the Evangeline Thruway Redevelopment Team, through their Evangeline Corridor Initiative) to relieve the impact of the Connector structure and enhance connectivity and multimodal opportunities, another subalternative design was added for consideration. SubAlternative M-1 would raise the height of the Connector mainline structures to allow for an additional bump-up in vertical clearance in the downtown core area. The base condition would be 22 feet (as mandated in the 2003 ROD as part of the mitigation plan for the Sterling Grove Historical District); M-1 would raise that level up to 30 feet throughout the downtown area.

SubAlternative M-1, providing for a 30 foot vertical clearance in the downtown area.

6) The segment north of downtown between the Louisiana & Delta Railroad Breaux Bridge Spur and I-10 also underwent some major changes between Tier II and Tier III. In particular, LCP had to resolve a beef from the ECI over the latter’s proposal for a North Gateway design keyed on a large circle interchange for Willow Street. The consultants ultimately rejected that design due to insufficent and incompatible traffic flow, and went with the conventional slip-ramp urban diamond design from the original 2003 ROD. However, they did make some modest concessions to the ECI regarding the two local “crossunder” connections bracketing the Willow Street interchange; and they also found an unique way of providing the north connection ramps to the central Downtown segment. The graphic below shows the results.

Base Refinement Alternative North Segment, including the Willow Street interchange and local "crossunder" roundabouts for local access.
Base Refinement Alternative North Segment, including the Willow Street interchange, braided north connection ramps for the Thruway, and local “crossunder” roundabouts for local access.

The design revisions that stand out are: the two “dogbone roundabouts” that are now added to negotiate access at the Donlon Avenue/Walmart Drive and Castille Avenue/Dr. Martin Luther King Drive crossover intersections with the Thruway; and the newly relocated connection ramps to the Thruway that are now braided with the south ramps to the Willow Street interchange. In order to fit the Donlon and Northside Walmart access roads to meet the new “bone ’bout,” new local connectors are built, and the existing 3/4 intersection with Donlon/WMT are modded into RIRO (right-in/right-out) intersections. In addition, portions of the existing two-way service road fronting the Thruway are eliminated south of Chappius Drive, which is now channeled along the remaining portion to Willow Street.

The north roundabout connecting MLK Drive and Castille with the service roads flanking the Thruway also got some modest tweaking in order to save some ROW space and better serve local access. The biggest change is the addition of a new local street that would run parallel to the Thruway between MLK and Willow that would link to a new tie-in to a truncated frontage road. This would simplify greatly the design of the Castille/MLK roundabout, since it serves as the transition between the beginning of the one-way frontage road network and the existing two-way service roads. (The crossover at Chalmette Drive that was originally scheduled to be the transition is now eliminated, giving more space for the elevated section of the Connector mainline to drop back to grade level for the I-10 interchange.)

A closer view of the Base Alternative design for the Willow Street Interchange and the two dogbone roundabouts.

It was all of these refinements that were introduced by the LCP and LADOTD teams: first to the Community Work Group on Wednesday, and then to the Technical Advisory Committee Thursday morning and the general public via the Public Meeting/Moderated Session Thursday night.

Public and stakeholder comment (both oral and written) was solicited at the Open House Public Meeting; feedback will be taken and recorded for official posterity up until November 1st. Then, if warranted, revisions to the E2E alternatives will be developed and presented to the CSS committees (CWG and TAC), and presented to the public through another Open House Public Meeting. Once feedback response to that is received, the Executive Committee will be activated to ingest all the reaction and select the final recommended alternatives. After that happens, the finalists  would undergo the detailed evaluations of an SEIS, the selection of a Supplemental Preferred Alternative for approval from the Acadiana MPO and Lafayette Consolidated Government, the production and release of the Draft SEIS document for official review, the official Draft SEIS Public Hearing for public review, the development of the Final SEIS document with the selection of the winning Supplemental Selected Alternative for final approval, and the Supplemental Record of Decision for the SSA that would then head back into the originally planned CSS Corridor Functional Design Plan process to develop the detailed design specifics.

And then the real process of finding funding for the project begins.

That is, unless the Sierra Club and the Concerned Citizens group decide to take another legal shot at derailing the project. Based on the continuing howls of Connector opponents like Michael Waldon, who runs the anti-Connector blog Connector Comments, that’s pretty much a guaranteed deal. Waldon attended Wednesday’s CSS meeting, and submitted comments restating his opposition based on the concerns about: how the Connector would threaten to pollute the Chicot Aquifer by unleashing the poisons of the former Southern Pacific Railroad classification yard through digging of pilings; how the elevated freeway would blast noise into the surrounding neighborhoods such that expensive sound walls would be necessary; and how elevated freeways in general are such the devil that cities are demolishing them in droves to make way for beautiful surface boulevards more appropriate for local development. And, of course, to push for the Teche Ridge Bypass through St. Martin Parish as a much more friendly alternative. Considering the progress that LADOTD is getting on completing the rest of I-49 South/freeway US 90 through Lafayette Parish, including the now under construction Albertsons’ Parkway interchange and the proposed interchanges at South Ambassador Caffery Parkway, Youngsville Highway, and Verot School Road, however, it may be a bit too little, too late for that.

Another (or related) alternative suggested by Connector opponents is to simply build the Grand Boulevard segment of the Evangeline Thruway right now as a standalone project, while fully obstructing in every way progress in building the Connector freeway. Strangely enough, some proponents of the Connector are also warming to the idea of a standalone Grand Boulevard-ization of the Thruway; the Lafayette City-Parish Consolidated Government and the ETRT just reached an agreement to make a push to apply for another US Department of Transportation TIGER grant (the same process that landed them funds for what became the ECI) to design and build the Grand Boulevard section as a interim stepping stone until the Connector gets funding. Whether this is real or simply a push to get LADOTD to drop in some more funding for the additional enhancements (Signature Bridge, bike/ped paths, hardscaping, Complete Streets, higher clearance) remains to be seen.

As always, watch this space for further updates.

How Little Lies Grow Big (Or…Nope, The Connector Is NOT Going To Poison Lafayette’s Drinking Water)

My last post pretty much detailed the latest attempt by opponents of the Connector freeway project to exploit legitimate concern over the former Southern Pacific rail yard and potential possible contamination of the Chicot Aquifer, which provides Lafayette’s drinking water.

Well…further investigation confirms my initial belief that this is more blown up hype than actual threat. I’m not saying that clean water isn’t important, just that the screams from Connector opponents using this as a wedge to divert the project away are not as justified as they think.

The trigger of all this was a presentation on April 3rd given by the main anti-Connector group Concerned Citizens for Good Government (CCGG). They were the official group that sponsored the lawsuit in 2003-2004 which attempted to void the Record of Decision (ROD) issued in Feburary of that year, citing deliberate distortion and underreporting of harms to the neighborhoods affected by the freeway project through Lafayette. That lawsuit was dismissed by District Judge Tucker Melancon in August of 2004; whence he ruled that the Louisiana Department of Transportation and Development (LADOTD) and the Federal Highway Administration (FHWA) had followed correctly all its guidelines and protocols in their approval processes concerning the Connector. The ruling was appealed to the US Fifth Circuit Court of Appeals, but was upheld.

The CCGG then went a bit dormant until last year, when the LADOTD, FHWA, and Lafayette Consolidated Government decided to revive the Connector design and engineering study process with their Conceptual Design/CSS Study and preparation of a Supplemental Environmental Impact Statement (SEIS). Reviving their opposition to the Connector project as destructive to the “heart of Lafayette”; the CCGG were backing as an alternative an eastern bypass through St. Martin Parish along the Teche-Coteau Ridge above, refered to as the Teche Ridge Bypass.

While the main opposition from the CCGG in the original lawsuit was due to the possible impacts on the Sterling Grove Historical District which lies just to the east of the Connector right-of-way; an increasing point of opposition has become the direct impact of the elevated freeway on the property formerly used by Southern Pacific Railroad up to the 1950’s for their major classification and maintenance rail yard. The Connector ROW would transverse through the former rail yard property, which stands between the current Evangeline Thruway and the existing main rail line now used by BNSF Railway and Union Pacific Railroad.

Map of old Southern Pacific rail yard in Lafayette, circa 1940’s.
Google Earth overview of former SP Rail Yard property boundary over existing Lafayette, with location of nearby Lafayette Utility System water wells. (From CCGG slideshow presentation)
Proposed Concept 4-2 (Elevated with Grand Boulevard) for I-49 Lafayette Connector freeway; showing relationship to former SP rail yard between Johnston and Taft streets. (from LafayetteConnector.com)

The concern of a major project such as the Connector affecting the drinking water of a major city is most certainly legitimate, and I’m most certainly not going to cast aspersions on those who do fear the worst. However, as has been the case for much of the main opponents of this project, further research shows that this concern has been blown up so far out of proportion into a scare campaign long on propaganda and rage, and short on actual facts. That is, when they don’t twist them to suit their agenda.

Some background here: a new lawsuit is now undergoing litigation that seeks to force the original owners of the Southern Pacific rail yard property, now UPRR, to pay the full costs of cleaning up the contamination of the site; and also seeks to force the federal EPA, state Department of Environmental Quality (LADEQ), and Lafayette Utility Services (LUS) to declare the site and all water wells drawing water from the vicinity to be declared hazardous areas to be cordoned off and removed. LUS is involved in this because the main legal counsel for the lawsuit, William Goodell, Jr., had a very public press conference last December where he revealed that some contamination had been found in some LUS water wells surrounding the rail yard site, including trace elements of benzene, arsenic, and other pollutants. It is only a mere coincidence that Goodell was surrounded at his presser by representatives of the Greater Lafayette Sierra Club and by “activist” Michael Waldon. It is also just coincidence that the Sierra Club has been the principal opponent to the Connector project, and that Waldon is passionately opposed to the project enough to have a whole blog dedicated to trashing…ahhh, I mean, opposing it.

[Update (4-21-17): Michael Waldon has posted a comment to this post clarifying that he is NOT a plaintiff in the Goddell lawsuit; the correction is noted here. Also, much gratitude to Mr. Waldon for his graciousness, even if we disagree on the fundamentals regarding the Connector project.)

Which brings us to that April 3rd CCGG meeting, where Goodell, Waldon, and other Connector opponents and eco-worriers expressed their shock and horror that such a project would threaten to poison the people of Lafayette.

As we shall see, though, it’s more hype than real.

Part of the meeting was a slideshow presentation by Mr. Waldon where he attempted to make the case as to why the Connector was a dire threat to Chicot Aquifer and the water supply of Lafayette. The full slideshow is available here (via Google Drive); the group has also posted a video of the full meeting on YouTube.

For the record, Mr. Waldon’s credentials for this debate rests on his experience as a former hydrologist for the US Fish & Wildlife Service and his degrees in Environmental Engineering; he also teached at the local university in Lafayette transitioning between USL (Univ. of Southwestern Louisiana) and UL(L) (Univ. of Louisiana (Lafayette)).

Waldon starts with a history of the SP rail yard; serving freight and passenger rail traffic between Houston and New Orleans from as far back as the 1880’s up until 1959, when SP built an updated classification yard west of Lafayette near Walker Road.  Strangely enough, he does not go into what happened with the property for the nearly 60 years after the rail yard was abandoned. In a previous post here, I filled in those blanks:

It should be noted, of course, that the SPRR railyard has been inoperationable since the 1950’s, and that the property has been very much inactive save for the Consolidated Companies (“Conco”) distribution warehouse located at the intersection of the southbound Evangeline Thruway and Taft Street. There were earlier lawsuits that sought to mitigate the cleanup of the site by having Union Pacific pay for the full costs, but they were settled privately out of court.

A full article with details of the etology of the Goodell lawsuit appears here.

The Conco distribution plant is the only remaining active parcel left on the rail yard property, save for a gas station located on Johnston Street between the BNSF/UP RR crossing and southbound Evangeline Thruway. The remainder of the property appears to be abandoned.

Waldon’s presentation then goes into a geological description of the Chicot Aquifer itself:

Description of Chicot Aquifer geology (from CCGG presentation)

If anything, this graph actually understates the protection that the current aquifer has underneath Lafayette, because the clay layer protecting the water-laden sand is actually pretty thick in itself (15 to 20 feet), below the 30-40 foot surface soil. Considering that pilings for the Connector’s elevated structures would be dug generally to a depth of 30 feet, that should insure that the clay protective layer would not even be touched, let alone penetrated to the extent that the aquifer would be breached. Detailed soil borings that are required during the design and preliminary engineering process now ongoing would verify a lot of things.

Indeed, even if it was possible that the aquifer could be even remotely breached, it’s not as if LADOTD engineers and consultants aren’t aware of the issue and don’t have procedures and protocols available. This is straight from the 2003 Record of Decision, concerning possible impact of the Connector on the Chicot Aquifer:

In addition to all that, a Level 2 Site Assessment is now ongoing explicitly for the former railyard site as part of the Supplemental EIS, and an understanding has been reached with LADOTD where any cleanup of that site will be paid for through billing the original owners…which would be UPRR. LADOTD would be responsible for any costs of cleanup involving excavation for the pilings and direct ROW impacts.

Nevertheless, this probably won’t prevent Waldon from pushing on with his real agenda of stopping the Connector, since he apparently knows more than even the LADEQ hydrologists about the harms done by evil elevated freeways.

Moving on…we skip to this board where MW lists the contaminants that have been verified and are suspected to be found in the soils of the rail yard.

List of known and suspected contaminants found at former SP railyard (from CCGG presentation)

Now, that list does include some very bad dudes indeed. Arsenic can kill you in one drop. Creosote, used as a preservative for rail ties, is very toxic. No one will say that a site loaded up with that much waste shouldn’t be cleaned up, especially with a major freeway going through it. If this was Times Beach-level contamination, the hype would be worth it.

Problem is, though, the actual evidence defuses the screams of a potential toxic nightmare.

Lafayette Utilities Systems (LUS) is the local agency that regulates the quality of Lafayette’s water supply, and they are stringently regulated by LADEQ and the EPA to enforce the highest quality water standards. To that effect they are required to give an annual report on the quality of Lafayette’s drinking water using benchmark standards provided by the EPA. The last report covers inspections from 2015, and it gave Lafayette a solid, clean, bill of health regarding their drinking water supply. Remember, this covers Lafayette’s overall water quality, not just the area surrounding the rail yard. This chart from the report shows the prerequisite stats and values for the usual contaminants:

Lafayette Utilities System’s Water Quality Report for 2015 chart for contaminants (via LUS website, highlights added by me)

I’ve highlighted the values for some contaminants for a reason: those happen to be the very contaminants that Waldon, Goddell, and the Sierra Club plantiffs exploit the most to fuel the hyped dangers of the Chicot Aquifer being breached and polluted by the Connector freeway.

Take for example, arsenic. Waldon attempts in his presentation to magnify the threat by claiming that even a little bit of arsenic can be deadly to anyone’s water supply. What he conveniently ignores, though, is that the percentage of contamination of arsenic in Lafayette’s water is actually one-fifth of the value that the EPA declares as the benchmark for dangerous (2 parts per billion for Lafayette as compared to the 10 ppb standard). Zero, of course, would be the preferred standard, but considering that Lafayette is a huge city and that the rail yard has been inactive for nearly 60 years, there really is no danger of mass arsenic poisoning.

The same could be said of dichlorobenzene (DCB) which is a proven contaminant. The CCGG presentation (backed by a Goodell presser in January) makes major noises about how DCB has been found in the presence of water wells in north Lafayette since 2008 up to the latest 2015 report, and how that most definitely indicts and convicts the rail yard as THE source of contamination.

CCGG Presentation of alleged documented contamination of water wells in Lafayette by dichlorobenzene (DCB).

A look at the actual LUS 2015 report chart, though, says otherwise: the maximum rate for DCB was 0.25 ppb, as compared to the contamination benchmark set by the EPA of 75 ppb.

So…60 years of dormancy for a former rail yard has produced levels of contamination of Lafayette’s drinking water that don’t even begin to approach rudimentary levels of danger by EPA’s own standards?

Funny thing is, why wasn’t there that much concern about the railyard and its environmental after effects from these folks before the Connector freeway was envisioned? Oh, I know, the original plan was for the freeway to follow the Evangeline Thruway and avoid cutting through the rail yard site, but that would have devastated residents fronting the Thruway and McComb-Veazay. Is this newly found concern about the purity of Lafayette’s drinking water really just a ruse to find a new base for the next set of lawsuits forthcoming to halt the Connector and impose the more friendly to some people’s interest Teche Ridge Bypass?

My latter suspicion is confirmed by what Waldon does next in his presentation. He does actually acknowledge that the current Connector SEIS process now includes the Stage 2 Environmental Site Assessment for the rail yard that he originally said LADOTD would never, ever do; but then he muses that none of this is available to the public. (This is a standard grip that Waldon and the Teche Ridge lobbyists have for the Connector process overall.) Indeed, Waldon, in concluding his presentation, makes the same old tired accusations that the Connector public input process is corrupted because no one from his side was allowed to add feedback.

CCGG presentation board of alleged “deficiencies” of Lafayette Connector Stage 2 ESA and entire CSS process.

Of course, “no public involvement” means that Waldon and his Teche Ridge lobbyists weren’t able to dominate the Connector CSS meetings with hordes of “citizens” jumping to the mic to condemn this “evil monstrosity” and impose their “common sense” bypass route. Even though Waldon was able to literally cut and paste his entire blog into the record for the November public meeting before the Tier II process concluded. Even though Connector opponents were able to invade the Community Work Group and made an effort to impose their desired solution of Teche Ridge plus a “high speed boulevard” before they were found out and called out by Transportation Secretary Shawn Wilson. But no, the “public is being denied!!”

The best response to hyperbole is still to give out the facts and let reasonable people judge them by their merits. The process will tell the tale of whether the I-49 Lafayette Connector will be a net positive for the city or not…but in the meantime, beware of fearmongers selling nonsense in the name of “protection”. The only thing they are really protecting is their privilege.

The Connector And The Chicot Aquifer: A Threat Or A Ruse?

Now that it is more likely that the I-49 Connector freeway through Lafayette, if it is ultimately built, will be elevated through Lafayette, the battle lines are now more being more clearly drawn….especially by those who oppose the project and would rather it diverted east through the Teche Ridge Bypass.

It is becoming more and more apparent that the issue in which Connector opponents will hitch their battle on for defeating the project will be the possible impact on Lafayette’s Chicot Aquifer, which serves as the sole source of drinking water for the city.

After almost a year of inactivity, Michael Waldon’s Connector Comments blog in opposition to the project has revived itself in a fury of posts centered on the dire threat that the freeway project would pose to the drinking water supply of Lafayette.

The trigger for all this is a lawsuit currently ongoing in Federal court against the Union Pacific Railroad over their ownership of property in central Lafayette that used to serve for years by Southern Pacific Railroad as their main classification and distribution yard. The former site, which was abandoned in 1954 when the current rail classification yard was built west of Lafayette, used to house both maintenance facilities and reclassification for SP trains using the Lafayette Subdivision.

The lawsuit ostensively seeks to force the current owners of the property underlying the former rail yard, UPRR, to pay for a full environmental assessment and cleanup of the facility.

However, the plaintiffs in the lawsuit also have a second, more direct objective: to reveal the levels of contamination that the rail yard has caused, as a means to elevate concerns that construction of the Connector freeway would potentially threaten mass contamination of Lafayette’s water supply.

The prevailing theory is that pilings that would have to be dug to support an elevated freeway would threaten the protective layer of clay soils that overlay the aquifer, and possibly cause a breach that would allow hazardous materials into the water-bearing soils. In addition, there is the concern that driving pilings directly into the soils at the rail yard site would introduce a direct risk to the aquifer’s protection.

The Chicot Aquifer’s protective clay layer generally runs from 40 to 60 feet above the actual aquifer soils along the Connector’s stated route; the pilings that would be dropped to support the elevated structure would generally need 30 feet of depth. During the earlier Connector Environmental Impact study which led to the 2003 Record of Decision, it was noted that while there would be some potential weakening of protection for the aquifer, it could be managed through special design and construction techniques and outreach with state Department of Environmental Quality and local officials.

This latest lawsuit, however, has upped the ante a bit by citing that Lafayette’s water supply has recently been found to be breached with some marginal contamination from the railyard, including traces of arsenic, benzene, and other potential hazardous chemicals. The contamination was found to be below the levels of contamination set by the federal EPA, and mitigatable through treatment; nevertheless, the Lafayette Sierra Club (one of the plantiffs in the UPRR railyard suit) was inflamed enough to issue an open letter (warning, link is to PDF document via Google Drive) to Lafayette Consolidated Government officials calling for the following:

1) The shut off of all water wells drawing water from the Chicot Aquifer near the railyard site, pending a full assessment of the contamination;

2) The immediate closure and screening off of the railyard site as an official hazardous waste (“Superfund”) site;

3) A full assessment and cleanup of the site, paid for by the UPRR (in their capacity as the current owners of the SPRR).

Not surprisingly, since the Sierra Club is essentially the lead group for opponents to the Connector project, and Michael Waldon has also been one of their chief spokespeople as well as a long-time opponent of the project, he has exploited this issue to the fullest in brandishing the opposition. (In fact, the Connector Concepts blog notes that Waldon has been involved with the original plaintiffs in this lawsuit from the beginning; which include environmental attorney William Goddell, Jr. and original 2004 Connector lawsuit plaintiff Kim Goddell (William’s wife??); all of them spoke to a public anti-Connector meeting on January 19th sponsored by the Sierra Club’s Y-49 group.)

(Update 4-21-17: The previous paragraph has been corrected to reflect Michael Waldon’s role in support of the plaintiffs in the Goddell lawsuit; he is not, as I mistakenly noted originally, an actual plaintiff. My thanks to Mr. Waldon for noting the discrepancy of mine, and for his graciousness and congeniality, even as we are on opposite sides of this issue.)

Why this sudden shift in strategy by Connector opponents? Because the contamination issue is really the only issue that could potentially stop the Connector in its tracks. The last lawsuit in 2004 against the Connector ROD was based on the impacts to the Sterling Grove Historical District and the process not including any alternatives like the Teche Ridge Bypass; but that suit was totally rejected by US District Judge Tucker Melancon; and upheld on appeal.

It should be noted, of course, that the SPRR railyard has been inoperationable since the 1950’s, and that the property has been very much inactive save for the Consolidated Companies (“Conco”) distribution warehouse located at the intersection of the southbound Evangeline Thruway and Taft Street. There were earlier lawsuits that sought to mitigate the cleanup of the site by having Union Pacific pay for the full costs, but they were settled privately out of court.

In the meantime, the current consultants overseeing the current Conceptual Design Study and Supplemental Environmental Impact Statement (SEIS) process for determining the final design for the Connector project are also reassessing what degree of impact the railyard site would have. Some advocates of the now rejected Partially Depressed/Covered design option have advocated that LADOTD, in addition to any direct mitigation for any ROW used over the rail site, should also foot the costs for a full Stage 2 Environmental Assessment for the site and perhaps even pay the full cost for remediation and cleanup. LADOTD’s stated policy is only to pay for remediation costs directly related to ROW takings such as pile driving or excavation.

In addition, the Evangeline Thruway Redevelopment Team (ETRT), endowed by the LCG with developing means to mitigate the footprint of the Connector on the surrounding neighborhood, has suggested the same approach, with an eye on future development of the former site property.

In response, LADOTD (through Transportation Secretary Shawn Wilson, who is on the Executive Committee overseeing the project design) has said that while DOTD would not pay for a full remediation, LCG would not have to either, since standard protocol is to bill the property owners responsible for the contamination to begin with (i.e., UPRR).

The environmental reevaluation and SEIS process for the Connector project does include an updated assessment of the railyard site and other potential hazardous properties. A Stage 1 Assessment was already done for the entire Connector corridor last year, which did mark the rail yard for future investigation. Further analysis will be undertaken with the SEIS process; although Waldon naturally still is miffed that he had to undergo a Freedom of Information Act request to release the current information; and that the assessment in his view deliberately undersold the risk by not including the information from the Goddell lawsuit regarding contamination of the water wells.

All in all, the concern with the Chicot Aquifer and the Southern Pacific Railroad site is legitimate enough that those of us who support the Connector freeway project should demand LADOTD take the full measure to maximize protection for the drinking supply of Lafayette. Whether all the fuss thrown up by the Goddell lawsuit and Y-49 turns out to be real or just another amplified ruse to divert I-49 through Teche Ridge? That remains to be seen.

BREAKING: LADOTD Rejects LCG Final Push; Eliminates Depressed Options; Only Elevated Option Advances For Remaining Studies

And, as quickly the revolt rose, it was quashed.

The LADOTD’s I-49 Connector CSS Executive Committee just concluded their meeting; and they finalized their decision on which concept design for the Connector freeway would advance into the Tier III analysis and Supplemental Environmental Impact Statement (SEIS) study. Only the Series 4 Elevated options will now advance forward, and the Series 6 Semi-Depressed/Covered options have been officially eliminated.

This reflected the most recent comments by Transportation Secretary Shawn Wilson that the entire Conceptual Design/CSS/SEIS process had gotten too bogged down, and that it would be easier to proceed if one concept was agreed to. It also reflected LADOTD’s historical bias towards the Elevated option as the least expensive and most direct alternative for the Connector freeway.

However, local officials with Lafayette Consolidated Government, in particular the Evangeline Thruway Redevelopment Team (ETRT), had been pushing for more time to develop and analyze the Series 6 SD/C option as an alternative to Series 4. There was also concerns that many of the desired amenities that the local communities wanted to mitigate the footprint of an elevated Connector — such as a “signature bridge” landmark, an expanded greenspacing of the corridor, provisions for pedestrian walkways and bikeways, and greater connectivity between the neighborhoods that would be affected by the project — would not be funded by the state but passed on to LCG, risking the prospect of a cookie-cutter freeway traversing the heart of Lafayette.

Apparently, those concerns were overturned by the need to quickly finish the study in time to fight for limited funding.

My feelings on this are mixed here.

I’ve been all along a strong supporter of the Connector freeway as it stands, and it is apparent that the Elevated option is the most cost-effective and least disruptive alternative. I still would prefer this to any bypass of Lafayette (like the Teche Ridge Bypass further east).

However, LADOTD needs to be made aware that the implication of jamming a bare-bones elevated highway through Lafayette was how all the previous Connector efforts failed in a hail of public opposition. The ETRT’s Evangeline Corridor Initiative and the efforts of the local governmental groups were legitimate means of attempting to ease the impact of the project’s massive footprint; and their efforts were essentially summarily dismissed by LADOTD in a classic turf battle.

It remains to be seen if the final design concepts the consultants approve will include full funding and implementation of the ETRT’s design concepts. The implication of LADOTD “not caring” about the concerns of Lafayette, however, just got a major boost in justification…and that can’t be good. Especially if many jaded activists defect over to the Sierra Club/Teche Ridge Bypass lobby to fight against the project in its entirity.

The path to completing the Connector freeway just got that much more turbulent.

 

 

How LADOTD Arrogance And Ramrodding The Elevated Option Could Kill The Connector Freeway Project

I just recently read this morning’s article from the Lafayette Advertiser by Claire Taylor over the ruckus that took place yesterday at the latest I-49 Connector Community Work Group meeting…and it has me fuming.

It is getting more and more obvious that the LADOTD, through their consultant group Lafayette Connector Partners, is insistent on ramming a bare bones Elevated Option freeway down the collective throats of Lafayette citizens, with little if any concern or respect for those citizens who would be affected, or those who actually want to make the Connector freeway work the best for Lafayette.

Ms. Taylor’s article documents the tense and often heated arguments that took place between LADOTD Project Manager Tim Nickel and some members of the CWG, concerning questions they had about the Tier II analysis of the four alternatives put forth.  In the end, Nickel ignored their questions, finished the presentation over their heads, and abruptly dismissed the meeting, leaving many members in shock.

More from Ms. Taylor’s article:

When Interstate 49 [C]onnector committee members asked questions and voiced concerns Thursday about the planning  process and level of public input, the state highway department’s project manager ignored their questions and adjourned the meeting.

Tim Nickel with the Louisiana Department of Transportation and Development appeared to become frustrated with questions by members of the I-49 Lafayette community working group. As committee members asked questions near the end of a two-hour meeting, Nickel returned to a PowerPoint presentation, speaking over over their questions, then abruptly adjourned the meeting.

“We’re citizens who were invited to attend and participate, and DOTD shut us down with questions still to be asked,” CWG committee member John Arceneaux said afterwards.

Margaret Trahan, executive director of United Way of Acadiana and a CWG member, added, “Tonight’s meeting was very frustrating. I’m not leaving with a clear understanding of why I’m here.”

The main frustration that the CWG members had was with the analysis of the Concept 6 series of alternatives, in particular the Concept 6-2 “Cut-and-Cover” alternative that called for a full 1-1/2 mile covered tunnel with jet engine ventilation. That alternative was vetted to be the most expensive for the downtown section between Pinhook Road and the Louisiana & Delta Railroad spur crossing, at more than $800 million dollars. By contrast, the Series 4 Elevated Options, which call for an continuously elevated freeway throughout the corridor, was vetted to cost less than $430-450 million dollars….but that did not include any consideration of a “signature bridge” or alterations for neighborhood connectivity or pedestrian/bicycle accessability.

The meeting also exposed the conflict between the LCP team authorized by LADOTD to design the project and the Evangeline Thruway Redevelopment Team (ETRT), the group empowered by Lafayette City-Parish Consolidated Government to develop means to incorporate the Connector project with all the neighborhoods affected. The ETRT, through their Evangeline Corridor Initiative, had created their own separate design concepts for meeting that need; one each for the two concept design series that had advanced to the Tier II study analysis process. As a result, the ETRT had developed their own Cut-and-Cover proposal that ended up radically different than the Concept 6-2 “Cut-and-Cover” tunnel that was ultimately proposed by LCP/DOTD.

The main frustration from the CWG members was about why LCP didn’t allow for consideration in their cost analysis of the conceptual alternatives for additional funding for the “signature bridge” and other CSS design/connectivity components; and also why ETRT’s partial Cut-and-Cover proposal wasn’t given a better vetting or a chance to be altered.

Nickel’s response was that the LCP and consultant team couldn’t give an answer at that point because the process was still ongoing; and that the decisions would be done in January when final “hybrid” alternatives for the entire corridor would be created for Tier III and Supplemental EIS analysis and final selection.

In an earlier article for the Advertiser, Ms. Taylor summarized the situation nicely:

The tunnel version proposed by ETRT after meeting with residents near the interstate route wasn’t intended to be a 1.5-mile long tunnel, Blanchard said, but a partial cut and cover to reduce noise and provide connectivity. Instead of a cost estimate for a partial cut and cover, consultants provide a price for a 1.5-mile long tunnel with a large embankment and jet engine turbine. It includes all the bells and whistles, he said.

The elevated version is a bare-bones model that doesn’t include the cost of a signature bridge, pedestrian and bike lanes, or improvements along Evangeline Thruway such as a grand boulevard. Blanchard said it was a surprise to the ETRT Nov. 30 when Tim Nickel, project manager with the Louisiana Department of Transportation and Development, said he couldn’t commit to paying for bike and pedestrian paths even if they are inside the project right of way.

The group asked for a more limited cost estimate for the partial cut and cover design that would include less tunnel and less embankment than a large tunnel.

“The concern is the 4 series cost estimates, because they don’t include the cost of components such as the signature bridge, are artificially low, while the costs of 6.2, because they may include all the ‘bells and whistles,’ are artificially high,” Blanchard wrote.

The ETRT, Blanchard said, also raised many questions about the signature bridge, which has substantial community support but was not included in the four designs the consulting team advanced in the planning process.

Nickel also, as did his predecessor Toby Picard, dismissed a bit causticly the ETRT’s role in analysis of the conceptual alternatives, stating that they weren’t “an equal partner” in the consideration for a final Connector freeway alternative. Never mind that the ETRT is fully empowered by the original Joint Collective Agreement signed by LADOTD, FHWA, and LCG to provide direct feedback on the project’s impacts on the abutting neighborhoods.

When ETRT member Kevin Blanchard asked Nickel if he would commit to saying that the Series 6 alternatives — especially the Cut-and-Cover alternative — would be allowed to be altered by ETRT or would be eliminated in favor of the Elevated Series 4 concepts, Nickel was noncommited, saying that that decision would be reached by then.

CWG members also expressed frustration with the limited public feedback allowed at their meetings; public comment was limited to only notes on cards, with no time given for verbal discussion. In addition, the membership of the CWG has significantly dwindled down from its initial 60 members down to around 11, and most feedback from the Open House Meeting was limited to comments from other committee members or submitted from attendees at that meeting.

The only compromise that Nickel would give to the ETRT was to allow their objections to be put in the public record at the meeting; but there was no commitment by him to even discuss any of their concerns.

And, it’s not the first time that the LCP has been frosty to the ETRT; when the ECI originally introduced their alternate concepts for the freeway back in August, then Project Manager Toby Picard dismissed them as irrelevant to the process. After an uproar by Lafayette Parish Govermment Councilman Bruce Conque, Picard backed off and reluctantly allowed the ETRT/ECI alternatives into consideration.

But, it appears that LADOTD is still under the impression that only the cheapest, bare bones Connector project will be able to get funding in these austere fiscal days, and that they are driven to push the Elevated option down the throats of Lafayette without any consideration for what may be better.

This is playing with fire, because if LADOTD can’t handle the friendly criticism and analysis of those who do want the Connector built but done right for the citizens of Lafayette, then how will they react when the community revolts in opposition and joins the Teche Ridge Bypass lobby with their ultimate lawsuits and obstruction? The resulting delays could potentially kill not just the best chance to build I-49 through Lafayette, but possibly kill the entire I-49 South extension to New Orleans.

DOTD really needs to take heed and listen to the people for a change before they lose everything.

Chicot Aquifer Found To Be Partially Contaminated At Former Railyard Site: A Potential Setback For The Connector?

Updated…scroll to bottom.

This is a development that could have huge ramifications for the Connector freeway down the road; enough so to further inflame and incite support for the Teche Ridge Bypass if officials don’t resolve this quickly.

The Advertiser just reposted an article from KLFY.com (the local Lafayette CBS TV affiliate) on an ongoing lawsuit being litigated against the Union Pacific Railroad over the former Southern Pacific Railroad distribution yard facility near Johnston Street. The lawsuit claims that the former railyard site is now a source of potential contamination of the Chicot Aquifer, which is the sole source for Lafayette’s drinking water. This directly impacts the Connector freeway because the approved alternative from the 2003 Record of Decision and the modifications proposed during the current Conceptual Design Study and Supplemental Environmental Impact Statement processes all traverse some portion of the former railyard property between Johnston Street and Taft Street.

On Wednesday, one of the lawyers mitigating the lawsuit announced in a press conference that he had confirmed that some contamination of the Aquifer did indeed take place at the railyard, and that some of the contaminating substances had made their way into one of Lafayette’s water well intakes.

Here is some snippets from the KLFY article, that was also reposted over at the Lafayette Advertiser:

Water well 16 in Lafayette has tested positive for contamination, and now the city is being advised to take action to keep contaminated drinking water from reaching residents.

Lawyer William Goodell gave a stern warning to the city and its residents Wednesday night, KLFY reports.

“Me and my co-counsel are here to get this aquifer cleaned up, and to protect the environment, and we are not going to go away till it’s cleaned up,” said Goodell.

Goddell did note that the contamination was not serious enough as of now to warrant danger, but without immediate remediation and cleanup, things could get worse.

The ramifications for the Connector freeway are huge, and potentially even fatal, due to the ROW of the potential freeway traversing the SP rail yard property. Environmental regulations require that “brownfield” sites found to have induced contamination must be fully remediated and cleaned up before any construction of a facility can begin; or, if remedial steps to prevent contamination can’t be found, alternative routes that avoid the contaminated area must be sought. The original 2003 ROD for the Connector does acknowledge the possibility of contamination of the SP/UP rail site, but states that standard practices, special construction techniques, and direct consultation with the federal EPA and the state Department of Environmental Quality (LaDEQ) can be used to protect the aquifer from contamination.

Nevertheless, opponents of the Connector project have cited the protection of the Chicot Aquifer as one of the main reasons for opposing the freeway project and re-routing the freeway around Lafayette, mostly supporting the Teche Ridge Bypass alternative running east along St. Martin Parish. One of the plantiffs in the current lawsuit is the Greater Lafayette Sierra Club, which has been one of the principal leads in opposition to the Connector project.

What could make this a possibly fatal blow to the project is that if it is found that contamination has reached the level of the aquifer, which is based nearly 40 feet below ground level and protected by a clay layer, it would make it less effective to merely remove and process elsewhere contaminated soils. The standard procedure for minor contamination is either to dig up the contaminants, or dig down to a certain level (usually 15 feet), cap with a concrete or other barrier, then replace with clean soils. Special techniques for drilling for pilings that would hold the piers needed to maintain the elevated structures required for the freeway would protect against future contamination.

The problem is, though, if the contamination is so severe that it is directly penetrating the aquifer levels, then merely digging out becomes impossible, and only an “in place” remediation is possible. In that case, the project would have to be moved or adjusted to avoid entirely the contaminated site.

It is possible that a full cleanup can be done for the SP/UP facility prior to construction of the Connector facility, avoiding the need for moving the facility. Indeed, the regulations for constructing the facility requires a full remediation before one inch of soil can be turned.

However, this development does give a huge hammer to those who oppose the Connector, and probably clinches the likelihood of a second lawsuit against FHWA and LADOTD to block the expected approval of the refined RR-4 alternative and for restarting studies to include Teche Ridge. The first lawsuit was filed in 2003 after the initial ROD, but was thrown out in Federal court, including an appeal that was turned down.

As always, more on this development here as it breaks.

UPDATE (1-14-2017):

I recently discovered this press release from attorney William J. Goddell, Jr., who is the lead attorney for the plaintiffs filing the suit against Union Pacific Railroad among others over the contamination of Lafayette water supply from the former Southern Pacific Railroad rail yard property. It details the level of contamination that Goddell’s research found at the former rail yard site, and the expectation for further documentation from both the state Department of Environmental Quality (DEQ) and Lafayette Consolidated Government’s Lafayette Utilities System (LUS), which oversees the local protection of the Chicot Aquifer. Again, this is important because the rail yard site cuts directly through the approved alignment of the Connector freeway, and the fear of breaching the protection for the aquifer through driving piles for the proposed alignment is one of the principal objections by those opposing the project and supporting alternatives such as the Teche Ridge or Lafayette Regional Expressway bypasses.

The original document was released by Goddell at a December 14, 2016, press conference that was covered by KATC-TV; their report is here. The report also includes a snippet of Goddell speaking at the press confrence.

 

Why Looping I-49 Around Lafayette Is Not As Good As It Sounds: A Response To Roger Peak And Y-49

Just as it is becoming more and more clear that an elevated I-49 Connector through Lafayette is the most feasible cost-effective option for building the freeway; it is just as clear that the opposition to this project is as loud as it has been since the concept has been planned.

While most opposition to the Connector is mostly based on sheer NIMBYism of not wanting an elevated structure next to their neighborhood; there are also legitimate concerns about contamination of the Chicot Aquifier, which supplies Lafayette’s drinking water, as well as the costs of constructing the freeway, as opposed to the combination of looping the freeway around Lafayette (most often proposed through the Teche Ridge Bypass alternate through St. Martin Parish, less proposed through the Lafayette Regional Expressway loop to the west around Lafayette’s perimeter). As the process of Conceptual Design and the Supplemental Environmental Impact study proceeds, the opposition to the Connector has become a bit more active in stating their views.

Over at the Sierra Club’s “Y-49” Facebook page, a citizen and long-time opponent of the Connector freeway named Roger Peak just posted a letter “for the record” that he sent to the Lafayette Connector Partners (the group entrusted by LADOTD and FHWA to oversee the design process for the project) during their most recent Open House Public Meeting. The letter, actually written by another opponent of the Connector named Dennis Sullivan, essentializes the main points of opposition to the Connector and support for a combination of a bypass and “improvements” to the Evangeline Thruway via a “boulevard”. The full letter is below:

My goal here is not to disrespect Mr. Peak, Mr. Sullivan, or any other opponent of the Connector freeway or deny them their right as citizens to protest and oppose this project. However, as an proponent of the Connector, I do feel it’s within my reason to challenge some of Mr. Sullivan’s points and statements. I will critique as I follow his letter.

1) Chicot Aquifer Protection

First, the relevant portion of Mr. Sullivan’s letter:

The 2003 Record of Decision for the Connector project stated that there was more than adequate protection for the Chicot Aquifer since the clay layer that protects the permeable area runs nearly 40 to 60 feet thick below ground level. Pilings that would be driven for the elevated structure would go no deeper than 30-35 feet, well before the aquifier surface would be breached; and universally approved best practices and standard procedures would be enabled and executed to ensure that the aquifer is fully protected.

The one main area of concern has always been the site of the former Southern Pacific Railroad distribution yard, where contamination of the soil just below the surface has been found and documented. Opponents of the Connector cite correctly the risk of pilings surrounding the contaminated surface breaching the clay protective layer, threatening the aquifer. LADOTD has responded that the site is eligible for a full remediational cleanup, and that standard practices and procedures will be undertaken to protect the aquifer levels.

LADOTD and the Connector Design Team recently issued a presentation documenting all the issues of protecting the Chicot Aquifer and the means of protections available. The presentation is presented below.

More than likely, this will not ease the concerns of Connector opponents, who are simply locked in to opposing the freeway through Lafayette under any circumstances. However, to say that LADOTD or FHWA is simply not concerned at all about protecting the aquifer is simply not true. Also, invoking the Flint, Michigan water contamination debacle, which was a large scale man-made disaster based on political motives of privatization rather than an isolated incident of a small breach of property, is emotional scaremongering at its worst.

It should also be noted that there is a current standing lawsuit ongoing against Union Pacific Railroad (the current owners of the property of the former Southern Pacific railyard) to have them pay the full costs of any remediation and clean up of that facility. Since remediation and cleanup is a mandated requirement for constructing the Connector freeway, regardless of whomever ultimately pays the bill, using this as a reason for opposing the freeway is a bit deflective reasoning.

2) The Evangeline Thruway and the Connector Freeway: Heartbeats or Heart Stakes??

Here, Mr. Sullivan (and by relay, Mr. Peak) invokes the construction of the original Evangeline Thruway through Lafayette during the 1950’s and the supposed destruction of the neighborhoods it traversed in order to avoid what he believes to be the same mistake with the Connector. Problem is, he entirely misses the point about why the Evangeline Thruway was originally built, and how it has actually affected Lafayette.

Evangeline Thruway was originally designed to be an opening step towards an ultimate freeway facility going north-south (or, more accurately, north-southeast) through Lafayette. The wide median built at Willow Street was done explicitly to accommodate a future interchange; the 250 foot spacing between the one-way couplet (compromised only near Simcoe Street in order to avoid conflicts with the St. Genevieve Catholic Church facility) was designed to originally occupy an elevated freeway, and the accommodating roadways it connects (US 90 and US 167) were also created with full intent of ultimate upgrade to a limited access freeway. Temporary direct access was allowed in the initial stages of construction, but ROW acquisition for both the segments of US 90 south of Lafayette and US 167 north of Lafayette was designed for ultimate freeway upgradability. (US 167 was subsequently upgraded to a freeway to and beyond Opelousas as part of the original I-49 project to Alexandria and Shreveport.)

As for the apparent damage the Thruway has done to the “proud neighborhoods of the railroad’s Black middle class”? That’s a very interesting assertion; especially considering the explosive growth of Lafayette during the 60’s and 70’s due to the petrochemical boom and the development of the main university (first SLI, then USL, now UL(L). The oil glut of the 90’s did do some damage to Lafayette economically, but that was more an overall impact. Was the Thruway responsible for the rise and decline of Northgate Mall or the decision of Walmart to locate their Northside Supercenter there?

Currently, the Evangeline Thruway serves as the main source of access to both downtown (via mostly the Second Street/Third Street couplet, Jefferson Street, and Johnston Street), UL (via Johnston Street and University Avenue) and the Lafayette Regional Airport (via Surrey Street). It also serves as the main artery of access to the rapidly growing suburban enclaves further south, such as Youngsville and Broussard, and ultimately via US 90 south to New Iberia, Jeanerette, Baldwin, Franklin, and Morgan City. Is Mr. Sullivan saying here that things would be better if the Thruway wasn’t constructed to begin with?

In addition, you can make a serious case that the same railroad that apparently brought out the “great Black middle class” also caused the very division of the city of Lafayette as much as the Thruway, especially due to the centralized location of the former rail yard (before it was moved to the western fringes near Walker Road).

In any case, all this also ignores the basic fact that the proposed Connector freeway alignment simply uses most of the Thruway in order to be the least divisive and destructive. Other than a twelve block section of the median of the Evangeline Thruway from the Louisiana & Delta railroad spur crossing to around Simcoe Street, and a segment of the alignment straddling Chestnut Street, there are few if any residential displacements. And, the Elevated concepts under consideration allow for full and open access underneath the mainline structures for both people and vehicles to cross underneath, while deflecting the overwhelming majority of the heaviest traffic onto the mainline structures away from the surface streets. (The Depressed options bring forth their own benefits and risks; that is another story entirely.)

In any case, all this sounds like mere NIMBYism and fear of adjustment and a desire for restoring the mythology of isolated, close-fit neighborhoods where people merely walked 10 minutes to the local store or merely sat on their porches. In reality, Lafayette is not simply a patchwork of Port Barres and Abbevilles with a downtown hub; it’s a moderately-sized city which depends on transportation facilities that simply don’t meet their current demand, let alone the growth of the future.

3) The “Freeways to Boulevards” Fraud That Doesn’t Work

Here, Mr. Sullivan invokes a transportation concept that has become very popular of late for urban planners and car/freeway haters alike: the idea of pushing traffic away from currently elevated through freeway routes by converting them to surface at-grade boulevards for “economic development”. This “freeways to boulevards” concept took off with developers who wanted to tear down and tear up “ugly” elevated freeways that they claimed to obstruct the natural view and destroy inner city neighborhoods. The idea is that traffic wanting to merely pass through these cities are perfectly free to take long-way bypasses around them, but those wanting to go through them should be forced to slow down and traverse stoplights, bike lanes, and other obstructions so that they can stop and discover the beauty of those neighborhoods.

So far, there have been only a few communities that have attempted the “freeways to boulevards” concept, with mixed success. New York City had their Central Expressway downgraded to Central Avenue; and San Francisco after the devastating Loma Prieta earthquake of 1989 took out a double-deck section of Interstate 880 in Oakland, decided to simply rebuild it as a surface boulevard. That hasn’t stopped the New Urbanist faithful from gleefully pushing the concept on other cities. Freeway teardowns and boulevard conversions are currently being proposed in Kansas City (the southern Inner Loop section of I-70); Syracuse (I-81 through downtown), and New Orleans (the I-10 Claiborne Avenue viaduct).

Notice the disclaimer “proposed”, though. None of those proposals have been enacted, and alternatives that either preserve and improve the elevated segments or convert them into depressed/covered freeways with development allowed over them, are also under consideration. The main concern is that these new “boulevards” will not be able to handle the level of traffic that will remain on them, even with the diversion to bypass routes. Of course, that’s considered mostly a benefit for the New Urbanists; the better to force them to either stop in these neighborhoods or switch over to alternative means of transport (walking, bikes, buses, light rail).

It should also be noted that most of the freeway teardowns that are being implemented are isolated segments where alternative routes are being built or improved to meet the adjusted traffic need. In Houston, they are implementing the removal of the Allen Avenue Viaduct segment of Interstate 45 between I-10 and the US 59/Future I-69 stack interchange….but they are rebuilding and realigning I-45 along I-69 north to I-10 and then west on I-10 to maintain proper capacity. In most cases, the freeway segment is simply being dropped down (as in the Boston Central Artery/”Big Dig” project) or shifted along a close new alignment (as with the Dallas “Mixmaster” and “Horseshoe” projects along I-30 and I-45).

The relevance to the Lafayette Connector project, you ask? Well, opponents of this freeway have been pushing since the beginning for construction of an I-49 bypass along the eastern fringe of Lafayette, utilizing the Teche Ridge through St. Martin Parish. (Some have also been promoting a much longer bypass along the southern and western fringes of Lafayette Parish, called the Lafayette Regional Expressway, but the prohibitive costs and distance of that alternative deems it less attractive as a bypass alternative.) To them, Teche Ridge is a more “common sense” alternative that would avoid all the displacements and destruction of the Connector project, and allegedly at half the cost.

Most recently, Connector opponents have taken to proposing a combination proposal: build Teche Ridge as the I-49 South bypass, but also convert the Evangeline Thruway into a “high-speed” yet “neighborhood friendly” boulevard to handle the traffic that would use it. The claim is that Teche Ridge would remove enough traffic from the Thruway that the new “boulevard” would be able to both handle the remaining traffic and promote the appropriate development for the neighborhoods surrounding it.

One look at LADOTD’s current and projected traffic projections for the Evangeline Thruway puts that theory to bust. This is from the Lafayette Connector website, given as part of the third Open House Public Meeting last November.

The above graph shows the current traffic volume (based on 2015 values) on the Evangeline Thruway, listed as Average Daily Traffic (ADT). Notice that the Thruway couplet is listed as carrying 64,000 to 70,000 vehicles per day; which would be straining it for a four-lane freeway, let alone a six-lane arterial/2×3 one-way couplet.

Now we get to the projected ADT for 2040, provided that the Connector freeway is not built. Notice how the ADT values for the Thruway now jump to 86,000 VPD north of Johnston Street, and 95,000 VPD south of there heading towards Pinhook Road and the airport. Yeah…a boulevard will certainly handle that.

But, you say, won’t Teche Ridge divert enough traffic from the Thruway to make a boulevard possible? That’s what all the Connector critics say….but most credible studies show otherwise. In both 1993 with the North-South Corridor Study and in 2003 with the original Connector Final EIS/ROD documents, Lafayette Consolidated Government traffic engineers have done traffic studies on the Thruway to see what percentage of the Thruway traffic is truly bypassing the city rather than accessing places within the city. Their results consistently confirm that only 10 percent of the traffic on the Thruway is traffic bypassing the city; with the remaining 90 percent having orgins and/or destinations within Lafayette. Considering that the Thruway is the most direct and straightest connection between US 90 and both I-10 and I-49/US 167, that’s no surprise whatsoever.

There are other considerations why Teche Ridge is not the catchall solution some would argue, but that alone is a major justification for the Connector alignment.

For the record, shown above is the LCG’s predicted ADT for 2040 with the Connector built and running. Notice how the freeway not only attracts traffic from the surface Thruway, but also sucks up traffic from other major arterials….and, being six lanes, it can easily handle the work.

In fact, building the Connector freeway as proposed along with converting the existing Evangeline Thruway into an “urban boulevard” would be far more ideal for both balanced economic development for the abutting neighborhoods AND moving current traffic. Indeed, the proposals put out by the Evangeline Corridor Initiative integrate the idea of a boulevard into all of their Connector freeway proposals, with the idea of one enhancing the other.

4) The Second Big Lie Of “Build Around”: A Bypass Isn’t Inexpensive, But It’s Certainly Cheap

This is another assertion that opponents of the Connector freeway have blurted: that a bypass would be so much less expensive than the “Con” through Lafayette. Over at Michael Waldon’s Connector Comments website in opposition to the project, there are frequent references to the BILLION AND A HALF DOLLARS that would have to go through the alleged Connector rathole, only to have to tear it down 20 years later for a righteous boulevard and bypass. In comparison, they frequently quote the Teche Ridge Bypass as the “common sense” route, because it would cost “half as much” and be built “twice as quick” because it avoids tender and suggestive areas.

Reality, however, does not support that analysis.

The most recent cost estimates for the proposed Connector freeway concepts for the core downtown area were released to the public, and they are quite revealing. Again, these cover the costs for only the central core area between Pinhook Road and the L&D rail spur crossing.

What jumps out at you is the serious sticker shock of the cost for the Cut-and-Cover option, due to both the major need of ROW displacements, the construction of the tunnel, and the high maintenance and operational costs for the tunneled section. What also should jump at you is that the Elevated option (especially Concept 4-2 with the Evangeline Thruway boulevard sub-option) actually cost less than the originally approved 2003 EIS/ROD alternative. $426 million is a long way from $1 billion, I’d think.

Now, let’s do some addition: the segment south of Pinhook Road includes an improved crossing of the Vermilion River, the University/Surrey interchange (pending what happens with the proposed runway displacement at Lafayette Regional Airport), and the three-level interchange with Kaliste Saloom Road. Using current values, that would probably add around $125 to $150 million to the cost. Then, you have the section from the L&D RR spur to near I-10, that would include the elevated interchange with Willow Street and improvements to the frontage road system from Donlon Avenue/Walmart Drive to Chalmette Drive, and possibly even the proposed Willow Street Circle/Gateway Arch. That would be another, say, $50 million. CSS design modifications and improvements required for mitigation would add probably another $20 million; then maybe $3 million for cleaning up the old SP railyard facility. Add all that up, and it comes to around $650 million to $700 million total.

Now, that doesn’t include the local tax commitment to local neighborhood projects that would be proposed by the ETRT/ECI/TIGER team, but that would be a local issue. With the Feds pitching 90% of the funding since this is a federal highway project involving a High Priority Corridor, the state match required would come to about $70 million.

Compare that to what the bypass proposals would cost. The LRX certainly would be less expensive due to it going around the city, right? Ahh, WRONG. The LRX would be a 60 mile long bypass extending along the perimeter of western and southern Lafayette Parish, extending even into northern Vermilion and Iberia Parish. The most recent estimates of the most preferred alignment for the LRX placed the total costs at around $1.2 BILLION dollars for a full LRX semi-loop connection from US 90 to I-49. Last time I checked, $1.2 billion was greater than $700 million. By a lot. Plus, LRX is being proposed as a tollway, funded by bonds which would be paid back through implementation of tolls throughout the facility. The Connector would be built totally “free”, perhaps with “private-public partnership” (P3) funds to ease the tax hurt, along with the rest of the I-49 South upgrade to New Orleans. (There was some early talk about tolling the upgrade of US 90, but a study showed that tolls wouldn’t even pay half of the total costs of the upgrade.)

That would leave the Teche Ridge Bypass, which is the preferred choice of darn near every single one of the Connector opponents. That is far more reasonable…but still, the truth reveals some flaws.

Teche Ridge proponents have usually quoted a 1994 “feasibility study” that was undertaken by officials in St. Martin Parish (funded by profits from casinos operating in that parish) for their belief in that alignment as a suitable alternative to the Connector. That study placed the approximate costs of that alternative at roughly $400 million for a complete bypass connecting US 90 south to I-49 north. That figure was also quoted in the affadavit filed by the Concerned Citizens of Lafayette group’s lawsuit against the FHWA and LADOTD to block the original 2003 FEIS/ROD. That affadavit was also submitted to LADOTD as an official comment to the 2003 Final EIS.

LADOTD’s response to the portion promoting Teche Ridge’s apparent cost benefit is below:

That’s $601M, not including ROW and engineering, in 2002 US$. Extrapolate for inflation and add the necessary costs, and you’re probably closer now to $700-750 million….which is nearly the same cost as what the extended and extrapolated costs of the Elevated Option concepts for the Connector freeway would cost in full.

And that’s not all, either….because Teche Ridge is not considered to be a suitable alternative for I-49 South, as is every other bypass alternative, it would require an entirely new process for feasibility and environmental study from the beginning. That’s two years for feasibility, two years for environmental and engineering, then securing funding, then getting it into the transportation program. The currently approved transportation programs by LADOTD and the Acadiana Regional Planning Commision (the official Metropolitan Planning Organization for Lafayette and the parishes surrounding Lafayette) are keyed on I-49 South using the Connector freeway and an upgraded US 90; so is the enabling federal highway legislation. To upset that by shifting I-49 South to Teche Ridge or the LRX would be at best time and money consuming; and at worst threaten to kill the entire I-49 South upgrade.

And, to make things even more problematic, there are signs that Teche Ridge isn’t even ecologically and environmentally as safe a bet as its proponents would argue. That proposal would basically traverse the thin ridge of high land that separates the Cypress Swamp/Lake Martin lowland swamp wetlands from Bayou Teche. Most of that land is now converted to farmland or remain as support for the surrounding wetland. That would pose a significant risk to such fragile and sensitive land use in the form of drainage from the freeway invading the fragile wetlands or pouring into Bayou Teche, which is a designated Scenic Waterway. The increased noise level of Teche Ridge could also disturb the flight path of endangered birds that use Cypress Swamp as relief for their annual fall/spring migrations. This would certainly raise the ire of federal and state wildlife officials. Other than the probable encroachment of the Chicot Aquifer and the possible need for some wetland acquisition for the LFT runway displacement, the Connector has really no major environmental or ecological issues otherwise.

5) The Biggest Lie of All

The final riposte of Mr. Sullivan’s letter promotes a nice vivid fantasy that if Teche Ridge….ahhh, I mean, if a freeway loop is built and highway traffic is forced to abandon the Evangeline Thruway, the latter can be reworked into a beautiful Complete Streets boulevard that will support everyone from walkers to bicyclists, and revive Lafayette like nothing other.

Funny, but that’s exactly what the Evangeline Corridor Initiative is attempting to do with the Thruway right now….with the Connector freeway in place. That theory actually works because, unlike Teche Ridge, the Connector actually will take enough traffic off the Thruway that it can be reworked to be neighborhood friendly. And, surprise…it does it without even traversing Sterling Grove or McComb-Veazey or even Freetown-Port Rico, while allowing full access and connectivity underneath the freeway structure. By contrast, unless you are planning on downgrading the entirity of US 90 back down to 2×2 and dismantling the proposed interchanges now planned or under construction, you simply are not going to remove much traffic from the Thruway even with Teche Ridge built. If you think the Thruway is a disaster now with no sidewalks or consideration for the neighborhoods with 64K VDT, imagine it reduced to 4 lanes with 90K VDT. Even the best “boulevard” will fail that test.

As for hurricane evacuation effectiveness: only Connector opponents like Mr. Sullivan can explain how diverting hurricane evac traffic to the east through a 4-lane bypass and a reduced 4-lane boulevard would be better than a direct access 6-lane elevated freeway with full shoulders which would also allow for contraflow and also include the surface-level Thruway/boulevard as a backup. Not to mention that Teche Ridge would do absolutely nothing for an evacuation of Broussard or Youngsville, nor for evacuees escaping from Vermilion Parish using US 167 north through Lafayette.

Oh, and the example that Mr. Sullivan gives for his ideal Evangeline Thruway? That’s taken from a YouTube video dated January of 2016 that was linked in his letter showing a plan for removing a portion of the I-70 corridor in Denver. There’s one small problem: that’s not the finally approved plan for that corridor. The removal (and diverting I-70 to I-270 and I-76) was considered and then rejected as too expensive and disruptive; the ultimate final solution was to bury the existing I-70 corridor under a capped tunnel and build a boulevard section above it. You know…like the ECI’s Depressed/Capped Mainline and DOTD’s Cut-and-Cover Concept 6-2.

Finally, let me conclude with this: Yes, driving interstates and highways through local poor communities in the 60’s without any consideration for the neighborhoods affected was a huge, huge error in judgement, and in some cases, a deliberate crime. However, those crimes are history, and those highways are there, serving their stated purposes of moving people and goods to where they are wanted and needed. While it is fair and appropriate to question today whether those highways can be reformed or removed, those questions should be resolved on an individual case-by-case basis, with everyone’s input and feedback involved. And, whatever alternatives are proposed must meet the desires and needs of all who use the roads, not just some planner’s wet dreams for “redevelopment” or some people’s desire for bringing back “the past”. Whether we like them or not, however ugly they may be, freeways still move people who want their cars and trucks and vehicles; maybe instead of merely tearing them down or opposing them at all costs, we might attempt to build them with everyone’s needs balanced out.

The I-49 Lafayette Connector project is the most recent test as to balancing traffic need with the desire for abutting neighborhood improvement. The most recent plans offered meet those goals of balance. It would be a shame if NIMBYism and obstructionism for the mere sake of obstruction would kill the best chance for Lafayette to both relieve their most serious traffic issue AND lay the seeds for revival of its downtown and central core. A loop will be warranted down the line, even including Teche Ridge….but the Connector is needed TODAY. Let’s work together to build it to the best way possible, and save the bypass for later.

The Great Debunking Of The Teche Ridge Bypass: Why It Is NOT The Alternative To The Connector Some Would Argue

Map of proposed I-49 Lafayette Connector freeway

The group of people who are opposed to the I-49 Connector freeway project through Lafayette have always tended to build their case around an alternative alignment referred as the Teche Ridge Bypass, which would revert the proposed Interstate highway to the east of the center of Lafayette through St. Martin Parish, then reconnect with existing I-49 generally east of Carencro. Their argument has always been that Teche Ridge would be much cheaper, would avoid the displacements and divisions that the Connector alignment using the Evangeline Thruway/US 90 corridor would allegedly ensue, and could be built in “half the time” for “half the cost”.

With all respect to these people, who’s legitimate concerns about the impact of the Connector are worthy of addressing, I will show here why Teche Ridge is not as much a slam dunk solution to finishing I-49 through Lafayette. Indeed, a closer investigation will find that it is more of an airball.

First, a brief history summary lesson: In 1993, after the first I-49 Connector environmental study was terminated before a Final Environmental Impact Statement could be produced, the Lafayette Metropolitan Planning Organization (MPO, at that time called the Lafayette Areawide Planning Commission) paid for the Lafayette North-South Corridor Study, which analyzed 4 alternative corridors for completing I-49 through Lafayette. One circled around metro Lafayette to its west and south (Western Bypass); two bypassed Lafayette to the east (Eastern Bypass ran from just north of Carencro to near Breaux Bridge to link up with US 90 just north of Broussard; Eastern Alignment was similar to Eastern Bypass but shifted its connection to I-49 North to just south of Gloria Switch Road); and one used the Evangeline Thruway/US 90 corridor. A map of the LN/SCS alternatives studied appears below:

Corridors for Lafayette North-South Corridor Study (1993)
Full report downloadable by clicking on link.

That study concluded that the Evangeline Thruway corridor was still the most desirable and cost-efficient choice for extending I-49 due to environmental factors and traffic counts. Their analysis reported that since only 11% of traffic on the Thruway/US 90 corridor was traffic bypassing the city of Lafayette, a bypass would not attract or divert enough traffic from the central corridor to be cost effective; and there would also be enormous environmental impacts on wetlands and sensitive tributaries (such as Cypress Swamp and the Vermilion River).

It was soon after that study was released that opponents of the Connector decided to search for another east bypass alternative that would be more suitable for their needs; by 1994, it appeared that they had found it when the St. Martin Parish Police Jury contracted out the engineering firm of Baker and Associates to perform a “feasibility study” on a new bypass route. It was dubbed the “Teche Ridge Bypass” because it followed the Couteau-Teche Ridge that overlooks the Bayou Teche and Vermilion River basins; running between Cypress Swamp and Bayou Teche basin. A rendering of the proposed Teche Ridge Bypass taken from that study appears below:

An overview of the I-49 Teche Ridge Bypass alternative,
from the Baker and Associates study.
(via the I-49 Teche Ridge Facebook page)

 Since then, Connector opponents have been pushing Teche Ridge as the go-to “common sense” alternative to avoid the “mistakes” of building the Connector through “the heart of Lafayette”. Under actual analysis, however, their arguments turn out to be wishful thinking at best.

First off, let’s deal with the cost issue. Teche Ridge proponents are always pushing that their bypass will be significantly cheaper to construct than the Connector (or, as they derisively call the central alignment, “the Con”). The initial quote given by the St. Martin Parish study gave a raw total cost of $400 million for construction of the bypass; which would roughly compare to the estimate of $350 million quoted for construction of the 5.5 miles of the Connector from I-10 to just south of Lafayette Regional Airport. The section just south of the airport to the US 90/LA 88 interchange is covered by another project linked to the entire US 90 to I-49 South upgrade. That section had an projected cost of $350 million; which would make the combined cost of the overlapping portions of the central corridor $750 million. That would appear to justify the Teche Ridge advocates’ claim of their alignment being cheaper.

Or, so they think.

The group Concerned Citizens of Lafayette teamed up with the Greater Lafayette Sierra Club to file a lawsuit against the Louisiana Department of Transportation and Development (LADOTD) and the Federal Highway Administration (FHWA) to block implementation of the 2003 Record of Decision approving of the currently proposed I-49 Connector freeway alignment. In their lawsuit, they explicitly promoted the Teche Ridge Bypass as a superior alternative to the approved corridor, citing costs and less negative impacts. Part of their case came in the form of an affidavit that they sent to LADOTD as a elongated comment response to the Final Environmental Impact Statement (FEIS) that was released in October 2002 prior to final approval in the ROD. Here is one paragraph of Concerned Citizens’ affidavit where they defend Teche Ridge:

LADOTD, in their 2003 I-49 Connector ROD, offered this series of responses to the Concerned Citizens’ brief, which calls directly into question those arguments.

Keep in mind that that was $601 million in 1993 US dollars; you would have to adjust accordingly for inflation to reach the current value for the Teche Ridge Bypass, which would probably bring the total to around $700-750 million. And, that would not include the costs of improvements that would still be required along the US 90 corridor to meet the traffic needs that Teche Ridge would fail to address because it would not attract traffic away from the Evangeline Thruway/US 90 corridor.
Most recently, opponents of the I-49 Connector and backers of Teche Ridge have used the current estimate of the costs of building the Connector freeway based on the now currently ongoing Corridor Conceptual Design Study as a wedge to push their favored bypass. They use the currently quoted estimated cost of $750 million to $1 billion as a wedge in their favor…except that that estimate doesn’t necessarily reflect the actual construction costs, but rather the amount of revenue that LADOTD has estimated they could get allocated for the project through Federal and state funding. Furthermore, there has still been no true official feasibility study of the Teche Ridge route to analyze its true economic and social impacts on its path, which would involve its own issues of sensitive wetlands and displacements as well. 
Future posts here will debunk the exact claims that the Connector would do permanent damage to Lafayette such that only a bypass would be sufficient. For now, though, a discussion of the fundamental flaws of Teche Ridge will suffice.
(to be continued)