Brand New Connector Update (February 2022): Finalist SEIS Alternatives Revealed; CSS Process Concludes; Timeline For Draft & Final SEIS Documents Set

UPDATE: This update was originally scheduled to be posted in November of 2021, but because of outside issues (and this thing called “a life”), I had to push it forward until late February. In any case, this provides an update to the present regarding the process of preliminary design and environmental analysis on the Connector freeway project. All illustrations are taken from the official Lafayette Connector website. – AJK

It has been a while since I last posted on events concerning the proposed Interstate 49 Connector freeway through Lafayette; and some major events and milestones have been achieved in the interim. This post is dedicated to getting you (and me) back up to speed on the most recent developments, especially the finalization of the revised and refined alternatives that will be fully vetted in the Supplemental Environmental Impact Statement (SEIS) for this project.

First, a bit of review for context’s sake.

The I-49 Lafayette Connector project was originally approved by the Federal Highway Administration (FHWA), in conjunction with the Louisiana Department of Transportation and Development (LaDOTD) through an EIS process ending in a Final EIS published in October 2002, then finalized and approved via a Record of Decision (ROD) published in January of 2003. The approved alignment selected was Alternative RA-4, modified with the MPO Subalternative (itself a modification of Subalternative F, allowing for a reconnected and depressed Simcoe Street underneath the mainline near the proposed Second Street/Third Street interchange) and Subalternative H (a connection underneath the freeway mainline between Martin Luther King Drive (henceforth MLK Drive), Castille Avenue allowing for a transition with the existing frontage road system).  An overall view of the 2003 Selected Alternative appears below. (All images in this post, unless otherwise noted, are from the Lafayette Connector website.)

The original I-49 Lafayette Connector Selected Alternative as approved in the 2003 Record of Decision
I-49 Lafayette Connector 2003 ROD Selected Alternative

The selection of the 2003 ROD Selected Alternative was, to say the least, highly controversial, with loud and consistent opposition to the project emanating from several groups of citizens, even leading to an unsuccessful lawsuit in 2003 to block further development of the project. The process to continue work on design of the Connector project hemmed and hawed through the period between then and 2015, when LaDOTD announced that they would attempt to revive the Functional Plan development to include Context Sensitive Solutions (CSS) design concepts, final engineering, and a reevaluation of the 2003 ROD for relevance to the current environment.

Based on the feedback from local officials, however, it was decided that major refinements and changes to the 2003 ROD alternative were necessary. Thusly, LaDOTD and the team that was overseeing the Functional Study process developed a detailed three tier process called the Concept Refinement Series that created new conceptual designs for the Connector freeway that would meet and mitigate the issues and opportunities. In addition, the FHWA determined that in lieu of an Evaluation, a Supplemental Environmental Impact Statement (Supplemental EIS or SEIS) was more appropriate for the further development of the project.

For the next two years, the Connector design team, along with LaDOTD, FHWA, and officials of local/city Lafayette, hashed upon detailed design modifications and various design concepts for the project, particularly the section going through the central core of the city. (There were also issues regarding the conflicts between the 2003 ROD Selected Alternative and the glide flight path of Runway 11 at Lafayette Regional Airport which had to be further resolved due to modifications of the runway dictated by the Federal Aviation Administration conflicting with plans to displace the runway to avoid the glide path conflict.)

The result of this process was that 27 initial design concept proposals encompassing 2 grade design concepts were ultimately reduced in a 3 tier process to four refinement alternatives. All four refinements utilized an continuous elevated Connector freeway through the central core; they differed in both the treatment of the Evangeline Thruway segment outside of the Connector right-of-way (existing one-way couplet refined or urban “grand boulevard” using the existing southbound ROW and northbound roadway downgraded to two-way local street), and the possible height of the elevated viaduct section (22 feet as directed in the 2003 ROD or as high as 30 feet as proposed by locals).

I-49 Connector 2017 Base Refinement Alternatives
Proposed Base Refinement Alternatives for I-49 Lafayette Connector freeway, reflecting the refinements and revisions developed through the tiered Concept Refinement Process.

Once that was settled in late 2017, LADOTD, FHWA, the Lafayette Connector Partners group that was overseeing the entire Functional Plan/CSS/SEIS process revived the CSS design and concept development with a series of workshops and public meetings in order to hash out the features and refinements that would be added to the corridor. The process involved incorporating Complete Streets principles of adding bicycle and pedestrian accessibility to the entirety of the corridor, landscaping and “greenscaping” of the corridor to better blend into and enhance the surrounding neighborhoods, and continuing to develop and complete the environmental analysis of the corridor in order to complete the SEIS process.

Based on those studies and processes, the Corridor partners ended up with and introduced to the public last November two conceptual final Refinement Alternatives for more developed study and analysis; they presented them to the public in the form of a public meeting that was held on November 4th, 2021.

They also introduced a virtual website giving the public a 3-D enhanced view of the final proposed alternatives, the planned enhancements, the changes in design since the 2003 ROD Alternative, and providing a proposed plan for displacement of residents and commercial properties. The updated timeline for completing the entire process is listed below.

The two finalist Refinement Alternatives, along with the existing 2003 EIS/ROD Selected Alternative, will be the alternatives studied in detail in the Supplemental EIS. 

The first decision that was made regarding the 2017 refinements was whether to use and refine the existing Evangeline Thruway couplet (the Evangeline Thruway couplet carries US Highway 167 and US Highway 90 through its length), or convert it to an “urban grand boulevard” in order to enhance commercial development. The decision was made to convert the westbound roadway ROW to the “grand boulevard” concept and the northbound roadway to a local two-way street.  The northbound roadway was originally a local two-way street designated as Clay Street prior to the Thruway’s construction in the 1950’s. The southbound roadway was originally designated as Sittig Street.) This was due to overwhelming public support for the urban boulevard concept as a kicker for future economic development of the local neighborhood (McComb-Veazey) as well as potential as a buffer between the freeway and that neighborhood.

The second decision involved where to place the southbound access from the Connector to downtown Lafayette. It was decided that the southbound downtown exit would be placed at Second Street further into the core of Lafayette, rather than braided with the entrance ramp at the Willow Street interchange. This was because the braided option would terminate at a roundabout connection between the Thruway, a local two-way service road accessing businesses and Donlon Avenue, and an entry/exit to the former Walmart Supercenter store (now closed and transferred to another business); and would conflict with the Thruway crossing of a local railroad spur serving Breaux Bridge that is operated by the Louisiana & Delta Railroad off the BNSF Railway/Union Pacific Railroad mainline just to the west. It was also the preference of local officials to have the exit closer to downtown.

The last remaining issue to be resolved between the two alternatives is the treatment of major intersections within the “Grand Boulevard” segment of Evangeline Thruway between Mudd Avenue and Pinhook Road. The major intersections of the Thruway with Second Street/Third Street, Jefferson Boulevard, Sixth Street (which evolves into Lee Avenue upon crossing the BNSF/UP tracks), Jefferson Street/Louisiana Avenue, Twelfth Street, and Fourteenth Street/Taft Street would be allowed free flow across the boulevard in both options; the remaining cross streets would be severed and reduced to right-in/right-out termini. The difference between the two final alternatives is that one would feature signalized intersections with these major collectors/arterials as the original Thruway does (the C3 “Signalized” Alternative); while the other would convert the major intersections into roundabouts (the  C4 “Roundabout” Alternative). Illustrations of the two alternatives, both their End-2-End and isolated central core sections, follow:

I-49 Lafayette Connector SEIS Finalist Alternative: 6A Signalized Alternative
I-49 Lafayette Connector SEIS Finalist Alternative: 6B Roundabout Alternative
Central Core Section of Signalized Alternative
Central Core Section of Roundabout Alternative

Many of the common features found in both finalist alternatives remain the same from the 2017 alternatives, but with some minor tweaks and revisions here and there. Going from south to north, here they are:

1)  Southern Terminus to Kaliste Saloom Road Interchange

The terminus to the south on US 90 has been moved a bit further south to just before the existing Verot School Road intersection, in order to add some accessibility between the existing frontage road system along US 90, Alligator Road, and Perimeter Road. New continuous one-way access roads will be constructed to flank the existing US 90 mainline, which will be upgraded to a 6-lane fully access controlled freeway; these will also be extended southward along US 90 all the way to the Albertsons Parkway/St. Nazaire Road interchange that has been recently completed in Broussard. Interchanges/grade separations with Verot School Road, Southpark Road (LA Highway 89), and Morgan Avenue/Eola Road will also be built as part of the freeway upgrade of US 90, but that is a separate project outside of the scope of the Connector freeway. As part of the Verot School interchange, a two-way local access frontage road will be built for accessing the businesses currently along US 90; the one-way access roads will be elevated to connect to an elevated Verot School Road that will cross over both I-49/US 90 mainline and the BNSF/UP rail mainline. The two-way road will connect with the northbound one-way access road at Alligator Road, then will be extended north to curve into Perimeter Road, which serves as an access to properties on the edge of Lafayette Regional Airport. The existing continuous 2-way frontage road running on the west side of US 90 will be converted to a one-way southbound access road. Both access roads flanking the mainline of US 90 will serve as a continuation of the Evangeline Thruway and provide separate local access to the access-controlled US 90 mainline; slip ramps will provide connections between the mainline and access roads for selected interchange locations.

 

South Terminus to LFT, including Kaliste Saloom Rd. Interchange

The Kaliste Saloom Road interchange has also been tweaked somewhat since the 2017 refinements: the original 3-level directional interchange proposed and approved in the 2003 EIS/Record of Decision process has been modified into a 2-level “diverging T” interchange, where the left turning movements between I-49 and Kaliste Saloom now connect and intersect each other at grade rather than are grade separated. In addition, the connection between Kaliste Saloom and Hugh Wallis Road has been slightly modified, with connecting roads on both sides and an additional left turn movement for westbound Kaliste Saloom traffic to access commercial properties on the east side of K-S, using the existing K-S right-of-way. 

 2) University Avenue/Surrey Street Overpass (Lafayette Regional Airport) to Vermilion River Crossing

The University/Surrey overpass will have a reduced vertical profile for I-49/US 90 crossing over a depressed University/Surrey, due to the need to maintain the glide path of Runway 11-29 at Lafayette Regional Airport. Originally, as part of the 2003 ROD, this was to be a conventional overpass and interchange, with the subsequent conflict with 11-29’s glide path resolved through adding a 350-foot extension and displacement to that runway. That became infeasible, however, due to LFT being mandated by the Federal Aviation Administration to construct an Engineered Materials Arresting System (EMAS) extension on the east terminus of Runway 11-29, which would use up the area where the displacement extension would have been built. A separate ROD approved by the FAA for the original runway displacement (included within the FHWA/LaDOTD 2003 ROD) will require an update to adapt to the refinements for the University/Surrey overpass for the Connector SEIS process. This also mandated that the planned interchange for University/Surrey proposed in the original 2003 FEIS/ROD would have to be moved to Pinhook Road. Access to LFT from mainline I-49 would still be possible indirectly through the Pinhook and Kaliste Saloom  interchanges and the continuous one-way access road system flanking the mainline I-49/US 90 roadways.

University Avenue/Surrey Street Underpass near Lafayette Regional Airport

The Connector freeway will then cross the Vermilion River using the existing Evangeline Thruway/US 90 ROW, with the existing Thruway transitioned to a 6-lane mainline freeway with 3-lane one-way access roads flanking the mainlines and providing local business access. The current pedestrian path that runs below the Thruway on the south approach of the Vermilion River that connects Beaver Lake (aka Heymann Lake) to Heymann Park and Vermilionville will remain, and will get some refinements thanks to the CSS/Joint Use enhancement addition process. In addition, a gateway will be installed as a landmark feature introducing travelers to the city of Lafayette. 

Vermilion River/Beaver Park Crossing near Vermilionville

3) Pinhook Road Interchange

This will serve as the southern most access point between the Connector freeway and both the McComb-Veazey and Freetown-Port Rico neighborhoods, as well as the connection to the proposed Grand Boulevard along the Evangeline Thruway, which will access downtown.  The mainline freeway will pass over Pinhook Road while the one-way access roads will directly connect with Pinhook, then transition into the proposed boulevard that will be built along the ROW of the existing southbound Thruway roadway. (The existing southbound Thruway roadway will be converted back to a local two-way street and returned to the City of Lafayette for maintenance.) The mainline I-49 diverts from the existing Thruway ROW just to the north of Pinhook near the Fourteenth Street/Taft Street intersection; here is where the transition from flanking access roads to boulevard will take place. Traditional ramps will serve as the connections to and from the frontage roads and the mainline to/from the north; slip ramps will provide the same to the south. The Pinhook intersection/interchange will also feature a unique “displaced left turn” design where traffic seeking to turn south on Evangeline Thruway/I-49/US 90 from westbound Pinhook Road would have to cross over eastbound Pinhook traffic via a signalized dedicated roadway prior to approaching the Thruway intersection. This would require closing the current Pinhook Road intersection with Judy Street and transferring the latter’s connections further south to the current intersection of Pinhook with Gauthier Road. The DLT would also necessitate closure of the existing intersection of Pinhook with Chag Street; that would be reduced to a Right-In-Right-Out (RIRO) intersection.

In addition, in order to mitigate impacts to the Freetown-Port Rico neighborhood, which happens to be a designated National Historical District, access to the southbound Thruway roadway would be modified to remove direct access to homes fronting the roadway. This is because of Federally mandated access control due to the onramp from the southbound mainlane of I-49 to the Thruway for the Pinhook interchange. Drain Street, which runs parallel to the Thruway from Fourteenth Street to Sixteenth Street, will be extended further south to connect with Alley Street, thus providing an alternative frontage access to houses and properties facing the southbound Thruway. In addition, in order to allow for the transition between the boulevard section and the existing Thruway access road couplet, Fifteenth and Sixteenth streets will be severed between the access roads, and the existing northbound Thruway/future local street will be dead-ended at Fifteenth Street.

Pinhook Road Interchange/DLT Intersection

4) Central Core/Downtown Section 

This is where the Connector freeway leaves the Thruway and ventures on its own new terrain alignment, keeping straight before curving north across the former property of the old Southern Pacific Railroad classification yard to shadow Chestnut Street just east of the BNSF/UP railroad line. The continuous viaduct section through here would cut through the old railyard property, cross over Johnston Street, then shade Chestnut Street between the rail line and the current southbound Thruway roadway. That ROW would be converted into the 4-lane enhanced Urban Boulevard between Fourteenth/Taft and Second Street, where the Connector viaduct would return to the Thruway ROW. The current northbound Thruway would be rebuilt as a local two-way street.

A “Signature Bridge” feature would be built on the freeway viaduct as a landmark feature for downtown Lafayette, and the entire corridor would be transformed into an enhanced urban subspace through the application of Joint Use, CSS, and Complete Streets protocols. Bicycle lanes and wider pedestrian pathways would be constructed along the Thruway boulevard, and further enhancements in lighting, greenscaping, wayfaring, and other measures would be incorporated into the freeway and boulevard to fully integrate it into the existing neighborhoods and communities. This would allow opportunities for full redevelopment of businesses that would be displaced or disrupted by the construction of the Connector, and would also allow for connectivity of the Freetown-Port Rico and McComb-Veazey neighborhoods that have been divided from each other due to the Thruway and the railroad for decades. 

The only remaining feature that remains to be resolved for the project is the mode of connecting the major cross streets to the Urban Boulevard. The plan is to retain full traffic movements between the boulevard and all the major cross streets; Fourteenth/Taft, Twelfth, Johnston Street/Louisiana Avenue, Sixth (which becomes Lee Avenue after crossing the railroad), Jefferson Boulevard, and the Second Street/Third Street one-way couplet.  The other streets currently crossing the Thruway/boulevard would get RIRO treatments.

Two variations are being proposed for dealing with the major intersections: 

a) Signalized Alternative 

In this concept, the major cross streets would use traditional signalized intersections with the boulevard. Single dedicated left turn lanes would be built at these intersections (except at Johnston/Louisiana where double lefts would be built due to the heavier traffic and major importance of that arterial). The new two-way local street made from the old northbound Thruway roadway would have stop sign controls similar to traditional local streets, but would get some enhanced treatments (including possibly bike lanes and wider sidewalks). No adjustments would be needed to the existing street grid, other than having Simcoe Street severed on the west side of the Thruway system transition area near the Sterling Grove neighborhood. That is due to the proposed off-ramp from the freeway viaduct that would serve access from the north to the boulevard and downtown (via Second Street, which would remain a one-way westbound compliment to Third Street, which would remain one-way eastbound).

Central Core Section; Signalized Alternative
Treatment at Simcoe Street/Sterling Grove – Signalized Alternative

b) Roundabout Alternative

For this concept, instead of conventional intersections, the main cross streets will use roundabouts to connect with the Grand Boulevard. LaDOTD has become quite enamored with replacing major intersections with roundabouts of late; they say that roundabouts are less expensive and more efficient with handling traffic than the conventional signalized intersections. CSS designers and some urban planners are also more supportive of roundabouts due to their effect of slowing down (or “calming”) traffic. The same major intersections that currently take signals on the Thruway (plus Sixth Street, which does not) which would be improved under the Signalized Alternative, would get roundabouts under this alternative; and the Johnston Street/Louisiana intersection would get a “super roundabout” with additional lanes to meet its higher capacity.

Impacts would be slightly greater with the Roundabout Alternative due to alterations required at Simcoe Street, because of the proposed “dogbone roundabout” connected to the aforementioned access ramp from the mainline Connector to Second Street. This feature would modify Second Street to allow for two-way service westbound on Second across the railroad crossing, and the dogbone roundabout would allow for access to the east side of Simcoe Street, the urban boulevard, and the revised Thruway couplet through the Sterling Grove/Martin Addition neighborhoods. However, there would be some reduced accessibility due to construction of the Third/Simcoe/Boulevard roundabout severing Chestnut Street and portions of the west side of Simcoe Street, as well as severing the former northbound roadway fronting Sterling Grove (which would also be downgraded to a two-way local street; a new one-way access road would be built parallel to and aside of the Connector elevated mainline and the southbound roadway).

Central Core Section – Roundabout Alternative
Treatment of Simcoe/Second/Boulevard/Downtown On-Ramp – Roundabout Alternative

5) Second Street to L&DRR Rail Spur (Sterling Grove/Ballard Addition)

The proposed Connector freeway would return to the Evangeline Thruway couplet ROW right around Simcoe Street and would remain there up to the northern terminus at the existing I-49/US 167 interchange with I-10. The mainline would remain fully elevated through the section up to past the Willow Street interchange. An off-ramp starting just above Mudd Avenue would provide local access from southbound I-49 to the urban boulevard segment of the Thruway, as well as to Second Street for downtown access. The Evangeline Thruway would remain for local access to the Sterling Grove and Ballard Addition neighborhoods flanking it, with the viaduct shading the southbound Thruway roadway. However, as with the central section, the northbound Thruway would be reconstructed on a new roadway from Second Street to near Bellot Drive, where it would meet the old northbound roadway curvature.  The old, orphaned segment of the northbound Thruway would, like its other component further south, be rebuilt as a local two-way street. This is done to reduce the impact of the Thruway system on the Sterling Grove Historical District by creating more of a buffer between the Connector freeway and revised Thruway frontage road system and Sterling Grove.

Cross street access underneath the freeway between Simcoe Street and the crossing of the Louisiana & Delta Railroad (L&DRR) rail spur would be retained at Mudd Avenue (US 90 West), Sampson Street, and Bellot Drive; all other streets would be terminated at the Thruway roadways. Simcoe Street would be severed from the west due to the Second Street off-ramp in both alternatives; though both alternatives do have means of accessing the east side of Simcoe.

 

Connector Freeway/Evangeline Thruway segment through Sterling Grove/Ballard Addition (Roundabout Alternative)
Connector Freeway/Evangeline Thruway segment through Sterling Grove/Ballard Addition
(Signalized Alternative)

6) L&DRR Spur to I-10/I-49 Interchange/Northern Terminus (Includes Willow Street Interchange)

From the crossing of the Louisiana & Delta Railroad spur rail line serving Breaux Bridge to Interstate 10, the proposed I-49 Connector freeway would consume the Evangeline Thruway ROW. The existing at-grade expressway features of the Thruway would be converted into a continuation of the fully elevated freeway concept north to the existing intersection of the Thruway with Castille Avenue and Martin Luther King Drive (and the local two-way frontage roads currently flanking the Thruway). A continuous one-way access road system would flank the elevated mainline to allow direct access to the mainline via the Willow Street interchange, and local access to other segments as a continuation of the Thruway. This would then transition back to an at-grade freeway north of MLK-Castille for the approach to the existing I-10 interchange.

Connector Segment from L&DRR Spur to I-10 (including Willow Street Interchange

This segment does include some major modifications to the local street system for enhancing local access and connectibility.

a) Donlon Avenue/(Former) Walmart Access Road “Dogbone Roundabout

First, a dogbone roundabount is situated just south of the crossing of the rail spur for traffic wanting to access Donlon Avenue and the former Walmart Supercenter property (currently run as a local church). This roundabout is connected to the current two-way local frontage road that serves local businesses from Donlon to Willow Street, serving to separate them from the northbound Thruway access road. This is necessary to control access for the braided ramps that will be built for access to the mainline freeway for both the Willow Street interchange and traffic leaving downtown wanting to enter the freeway. (The latter is the complement to the southbound exit at Second Street.

The existing RCUT intersection between Donlon Ave., the Thruway, and the entrance/exit to the ex-Walmart property will be removed, with Donlon terminating at the existing two-way frontage road and the Walmart egress/entrance ending in a RIRO with the southbound access road. (The existing two-way service road on the west side of the Thruway would remain as is and terminate at the Walmart access road.)

Donlon Avenue/ex-Walmart Access Road Roundabout

b) Willow Street Interchange

The Willow interchange will be fitted into the current ROW as a conventional slip-ramp diamond interchange, with the current Thruway roadways serving as the access connections. The frontage road connections to Willow Street will get minor tweakage in order to satisfy control-of-access requirements along Willow. The existing Lafayette Visitors Center site, now located within the median of the Thruway where it meets Willow Street, will remain in its general location, albeit adjusted to avoid being underneath the Connector viaduct structure. Access to the VC via the southbound Thruway access road would remain the same.

Willow Street Interchange

The MLK-Castille connection would undergo some significant changes as well. The current convoluted intersection and connection between the existing Thruway and MLK/Castille/frontage roads would be replaced with another dogbone roundabout underneath the mainline freeway, allowing for full movements between the frontage roads, Castille Avenue, and MLK Drive. There would also be connections allowing for transitions to and from the one-way access road system serving the local function of the Evangeline Thruway.

The only major revision would be the elimination of the two-way frontage road on the west side of the Thruway between MLK Drive and Willow Street. A new “boulevard” would be constructed some 400 feet west of the Thruway/Connector ROW as a new backage road connection between the two streets. The existing two-way road would be converted to a single-lane one-way connection to the southbound access road connection and off ramp from I-49 to Willow Street. Hence, those wanting to access the freeway from there on the west side would have to go over to Willow Street, or go further to the Donlon-Walmart roundabout to access the northbound on-ramp.

Access Revisions at Willow Street interchange and MLK Drive/Castille Ave. Roundabout

8) I-49/I-10 Interchange (Northern Terminus)

Finally, the Connector would feed into the existing Interstate 49 that runs north to Opelousas, Alexandria, and ultimately Shreveport, through the existing I-10/I-49 full cloverleaf interchange. Additional auxiliary lanes would be added at the northbound exit ramps to I-10 and the southbound entry ramps from I-10 in order to handle the increased flow. There are plans to convert the I-10/I-49 interchange to a fully-directional interchange in order eliminate the loop ramp movements, but that is beyond the scale and scope of the Connector project.

 

I-10/I-49 Interchange (Northern Terminus)

9) Conclusion (for now)

As of this posting (now February of 2022), that seems to be what the final proposed alternatives for the Connector freeway will encompass, though there more than likely will be some other tweaks and minor revisions as this finishes the CSS and SEIS processes. A “Supplemental Preferred Alternative” must be selected and approved by all the entities involved (LCG, LaDOTD, FHWA) before the Alternatives Analysis and full environmental impact studies can be completed; this will be presented then to the public at the next stage of public meetings that are scheduled for March or April. Then, work would be completed on the Supplemental EIS for release to the public around June or July of this year.

The SEIS would also incorporate a draft Joint Use Development Plan for any and all refinements within the direct ROW of the freeway and “grand boulevard” segments; a revised Section 106 Memorandum of Agreement for mitigation of impacts to Sterling Grove Historical District (and possibly Freetown-Port Rico Historical District as well); a CSS Design Standards Manual to incorporate and document all the CSS design features and refinements into the project; documentation of noise and air impacts and any mitigation of such as needed; and a Level 2 Environmental Assessment of the former Southern Pacific Railroad yard property for possible cleanup and mitigation of possible impacts to the Chicot Aquifer.

The completed Draft SEIS would then be subjected to feedback and analysis by all the relevant authorities, including an official Public Hearing which is tentatively scheduled for August of this year. Based on this feedback, a Final SEIS would be produced which would document the selection and approval of a final Supplemental Selected Alternative; that process would then conclude with the issuance of a Supplemental Record of Decision (S-ROD) submitting FHWA’s final approval of the project. 

In short, there is still a long way to go before we can start celebrating the construction of the I-49 Lafayette Connector freeway….and that doesn’t even include the possible return of the lawsuits by those insistent on opposing this project. As always, watch this space for updates.

 

Why Looping I-49 Around Lafayette Is Not As Good As It Sounds: A Response To Roger Peak And Y-49

Just as it is becoming more and more clear that an elevated I-49 Connector through Lafayette is the most feasible cost-effective option for building the freeway; it is just as clear that the opposition to this project is as loud as it has been since the concept has been planned.

While most opposition to the Connector is mostly based on sheer NIMBYism of not wanting an elevated structure next to their neighborhood; there are also legitimate concerns about contamination of the Chicot Aquifier, which supplies Lafayette’s drinking water, as well as the costs of constructing the freeway, as opposed to the combination of looping the freeway around Lafayette (most often proposed through the Teche Ridge Bypass alternate through St. Martin Parish, less proposed through the Lafayette Regional Expressway loop to the west around Lafayette’s perimeter). As the process of Conceptual Design and the Supplemental Environmental Impact study proceeds, the opposition to the Connector has become a bit more active in stating their views.

Over at the Sierra Club’s “Y-49” Facebook page, a citizen and long-time opponent of the Connector freeway named Roger Peak just posted a letter “for the record” that he sent to the Lafayette Connector Partners (the group entrusted by LADOTD and FHWA to oversee the design process for the project) during their most recent Open House Public Meeting. The letter, actually written by another opponent of the Connector named Dennis Sullivan, essentializes the main points of opposition to the Connector and support for a combination of a bypass and “improvements” to the Evangeline Thruway via a “boulevard”. The full letter is below:

My goal here is not to disrespect Mr. Peak, Mr. Sullivan, or any other opponent of the Connector freeway or deny them their right as citizens to protest and oppose this project. However, as an proponent of the Connector, I do feel it’s within my reason to challenge some of Mr. Sullivan’s points and statements. I will critique as I follow his letter.

1) Chicot Aquifer Protection

First, the relevant portion of Mr. Sullivan’s letter:

The 2003 Record of Decision for the Connector project stated that there was more than adequate protection for the Chicot Aquifer since the clay layer that protects the permeable area runs nearly 40 to 60 feet thick below ground level. Pilings that would be driven for the elevated structure would go no deeper than 30-35 feet, well before the aquifier surface would be breached; and universally approved best practices and standard procedures would be enabled and executed to ensure that the aquifer is fully protected.

The one main area of concern has always been the site of the former Southern Pacific Railroad distribution yard, where contamination of the soil just below the surface has been found and documented. Opponents of the Connector cite correctly the risk of pilings surrounding the contaminated surface breaching the clay protective layer, threatening the aquifer. LADOTD has responded that the site is eligible for a full remediational cleanup, and that standard practices and procedures will be undertaken to protect the aquifer levels.

LADOTD and the Connector Design Team recently issued a presentation documenting all the issues of protecting the Chicot Aquifer and the means of protections available. The presentation is presented below.

More than likely, this will not ease the concerns of Connector opponents, who are simply locked in to opposing the freeway through Lafayette under any circumstances. However, to say that LADOTD or FHWA is simply not concerned at all about protecting the aquifer is simply not true. Also, invoking the Flint, Michigan water contamination debacle, which was a large scale man-made disaster based on political motives of privatization rather than an isolated incident of a small breach of property, is emotional scaremongering at its worst.

It should also be noted that there is a current standing lawsuit ongoing against Union Pacific Railroad (the current owners of the property of the former Southern Pacific railyard) to have them pay the full costs of any remediation and clean up of that facility. Since remediation and cleanup is a mandated requirement for constructing the Connector freeway, regardless of whomever ultimately pays the bill, using this as a reason for opposing the freeway is a bit deflective reasoning.

2) The Evangeline Thruway and the Connector Freeway: Heartbeats or Heart Stakes??

Here, Mr. Sullivan (and by relay, Mr. Peak) invokes the construction of the original Evangeline Thruway through Lafayette during the 1950’s and the supposed destruction of the neighborhoods it traversed in order to avoid what he believes to be the same mistake with the Connector. Problem is, he entirely misses the point about why the Evangeline Thruway was originally built, and how it has actually affected Lafayette.

Evangeline Thruway was originally designed to be an opening step towards an ultimate freeway facility going north-south (or, more accurately, north-southeast) through Lafayette. The wide median built at Willow Street was done explicitly to accommodate a future interchange; the 250 foot spacing between the one-way couplet (compromised only near Simcoe Street in order to avoid conflicts with the St. Genevieve Catholic Church facility) was designed to originally occupy an elevated freeway, and the accommodating roadways it connects (US 90 and US 167) were also created with full intent of ultimate upgrade to a limited access freeway. Temporary direct access was allowed in the initial stages of construction, but ROW acquisition for both the segments of US 90 south of Lafayette and US 167 north of Lafayette was designed for ultimate freeway upgradability. (US 167 was subsequently upgraded to a freeway to and beyond Opelousas as part of the original I-49 project to Alexandria and Shreveport.)

As for the apparent damage the Thruway has done to the “proud neighborhoods of the railroad’s Black middle class”? That’s a very interesting assertion; especially considering the explosive growth of Lafayette during the 60’s and 70’s due to the petrochemical boom and the development of the main university (first SLI, then USL, now UL(L). The oil glut of the 90’s did do some damage to Lafayette economically, but that was more an overall impact. Was the Thruway responsible for the rise and decline of Northgate Mall or the decision of Walmart to locate their Northside Supercenter there?

Currently, the Evangeline Thruway serves as the main source of access to both downtown (via mostly the Second Street/Third Street couplet, Jefferson Street, and Johnston Street), UL (via Johnston Street and University Avenue) and the Lafayette Regional Airport (via Surrey Street). It also serves as the main artery of access to the rapidly growing suburban enclaves further south, such as Youngsville and Broussard, and ultimately via US 90 south to New Iberia, Jeanerette, Baldwin, Franklin, and Morgan City. Is Mr. Sullivan saying here that things would be better if the Thruway wasn’t constructed to begin with?

In addition, you can make a serious case that the same railroad that apparently brought out the “great Black middle class” also caused the very division of the city of Lafayette as much as the Thruway, especially due to the centralized location of the former rail yard (before it was moved to the western fringes near Walker Road).

In any case, all this also ignores the basic fact that the proposed Connector freeway alignment simply uses most of the Thruway in order to be the least divisive and destructive. Other than a twelve block section of the median of the Evangeline Thruway from the Louisiana & Delta railroad spur crossing to around Simcoe Street, and a segment of the alignment straddling Chestnut Street, there are few if any residential displacements. And, the Elevated concepts under consideration allow for full and open access underneath the mainline structures for both people and vehicles to cross underneath, while deflecting the overwhelming majority of the heaviest traffic onto the mainline structures away from the surface streets. (The Depressed options bring forth their own benefits and risks; that is another story entirely.)

In any case, all this sounds like mere NIMBYism and fear of adjustment and a desire for restoring the mythology of isolated, close-fit neighborhoods where people merely walked 10 minutes to the local store or merely sat on their porches. In reality, Lafayette is not simply a patchwork of Port Barres and Abbevilles with a downtown hub; it’s a moderately-sized city which depends on transportation facilities that simply don’t meet their current demand, let alone the growth of the future.

3) The “Freeways to Boulevards” Fraud That Doesn’t Work

Here, Mr. Sullivan invokes a transportation concept that has become very popular of late for urban planners and car/freeway haters alike: the idea of pushing traffic away from currently elevated through freeway routes by converting them to surface at-grade boulevards for “economic development”. This “freeways to boulevards” concept took off with developers who wanted to tear down and tear up “ugly” elevated freeways that they claimed to obstruct the natural view and destroy inner city neighborhoods. The idea is that traffic wanting to merely pass through these cities are perfectly free to take long-way bypasses around them, but those wanting to go through them should be forced to slow down and traverse stoplights, bike lanes, and other obstructions so that they can stop and discover the beauty of those neighborhoods.

So far, there have been only a few communities that have attempted the “freeways to boulevards” concept, with mixed success. New York City had their Central Expressway downgraded to Central Avenue; and San Francisco after the devastating Loma Prieta earthquake of 1989 took out a double-deck section of Interstate 880 in Oakland, decided to simply rebuild it as a surface boulevard. That hasn’t stopped the New Urbanist faithful from gleefully pushing the concept on other cities. Freeway teardowns and boulevard conversions are currently being proposed in Kansas City (the southern Inner Loop section of I-70); Syracuse (I-81 through downtown), and New Orleans (the I-10 Claiborne Avenue viaduct).

Notice the disclaimer “proposed”, though. None of those proposals have been enacted, and alternatives that either preserve and improve the elevated segments or convert them into depressed/covered freeways with development allowed over them, are also under consideration. The main concern is that these new “boulevards” will not be able to handle the level of traffic that will remain on them, even with the diversion to bypass routes. Of course, that’s considered mostly a benefit for the New Urbanists; the better to force them to either stop in these neighborhoods or switch over to alternative means of transport (walking, bikes, buses, light rail).

It should also be noted that most of the freeway teardowns that are being implemented are isolated segments where alternative routes are being built or improved to meet the adjusted traffic need. In Houston, they are implementing the removal of the Allen Avenue Viaduct segment of Interstate 45 between I-10 and the US 59/Future I-69 stack interchange….but they are rebuilding and realigning I-45 along I-69 north to I-10 and then west on I-10 to maintain proper capacity. In most cases, the freeway segment is simply being dropped down (as in the Boston Central Artery/”Big Dig” project) or shifted along a close new alignment (as with the Dallas “Mixmaster” and “Horseshoe” projects along I-30 and I-45).

The relevance to the Lafayette Connector project, you ask? Well, opponents of this freeway have been pushing since the beginning for construction of an I-49 bypass along the eastern fringe of Lafayette, utilizing the Teche Ridge through St. Martin Parish. (Some have also been promoting a much longer bypass along the southern and western fringes of Lafayette Parish, called the Lafayette Regional Expressway, but the prohibitive costs and distance of that alternative deems it less attractive as a bypass alternative.) To them, Teche Ridge is a more “common sense” alternative that would avoid all the displacements and destruction of the Connector project, and allegedly at half the cost.

Most recently, Connector opponents have taken to proposing a combination proposal: build Teche Ridge as the I-49 South bypass, but also convert the Evangeline Thruway into a “high-speed” yet “neighborhood friendly” boulevard to handle the traffic that would use it. The claim is that Teche Ridge would remove enough traffic from the Thruway that the new “boulevard” would be able to both handle the remaining traffic and promote the appropriate development for the neighborhoods surrounding it.

One look at LADOTD’s current and projected traffic projections for the Evangeline Thruway puts that theory to bust. This is from the Lafayette Connector website, given as part of the third Open House Public Meeting last November.

The above graph shows the current traffic volume (based on 2015 values) on the Evangeline Thruway, listed as Average Daily Traffic (ADT). Notice that the Thruway couplet is listed as carrying 64,000 to 70,000 vehicles per day; which would be straining it for a four-lane freeway, let alone a six-lane arterial/2×3 one-way couplet.

Now we get to the projected ADT for 2040, provided that the Connector freeway is not built. Notice how the ADT values for the Thruway now jump to 86,000 VPD north of Johnston Street, and 95,000 VPD south of there heading towards Pinhook Road and the airport. Yeah…a boulevard will certainly handle that.

But, you say, won’t Teche Ridge divert enough traffic from the Thruway to make a boulevard possible? That’s what all the Connector critics say….but most credible studies show otherwise. In both 1993 with the North-South Corridor Study and in 2003 with the original Connector Final EIS/ROD documents, Lafayette Consolidated Government traffic engineers have done traffic studies on the Thruway to see what percentage of the Thruway traffic is truly bypassing the city rather than accessing places within the city. Their results consistently confirm that only 10 percent of the traffic on the Thruway is traffic bypassing the city; with the remaining 90 percent having orgins and/or destinations within Lafayette. Considering that the Thruway is the most direct and straightest connection between US 90 and both I-10 and I-49/US 167, that’s no surprise whatsoever.

There are other considerations why Teche Ridge is not the catchall solution some would argue, but that alone is a major justification for the Connector alignment.

For the record, shown above is the LCG’s predicted ADT for 2040 with the Connector built and running. Notice how the freeway not only attracts traffic from the surface Thruway, but also sucks up traffic from other major arterials….and, being six lanes, it can easily handle the work.

In fact, building the Connector freeway as proposed along with converting the existing Evangeline Thruway into an “urban boulevard” would be far more ideal for both balanced economic development for the abutting neighborhoods AND moving current traffic. Indeed, the proposals put out by the Evangeline Corridor Initiative integrate the idea of a boulevard into all of their Connector freeway proposals, with the idea of one enhancing the other.

4) The Second Big Lie Of “Build Around”: A Bypass Isn’t Inexpensive, But It’s Certainly Cheap

This is another assertion that opponents of the Connector freeway have blurted: that a bypass would be so much less expensive than the “Con” through Lafayette. Over at Michael Waldon’s Connector Comments website in opposition to the project, there are frequent references to the BILLION AND A HALF DOLLARS that would have to go through the alleged Connector rathole, only to have to tear it down 20 years later for a righteous boulevard and bypass. In comparison, they frequently quote the Teche Ridge Bypass as the “common sense” route, because it would cost “half as much” and be built “twice as quick” because it avoids tender and suggestive areas.

Reality, however, does not support that analysis.

The most recent cost estimates for the proposed Connector freeway concepts for the core downtown area were released to the public, and they are quite revealing. Again, these cover the costs for only the central core area between Pinhook Road and the L&D rail spur crossing.

What jumps out at you is the serious sticker shock of the cost for the Cut-and-Cover option, due to both the major need of ROW displacements, the construction of the tunnel, and the high maintenance and operational costs for the tunneled section. What also should jump at you is that the Elevated option (especially Concept 4-2 with the Evangeline Thruway boulevard sub-option) actually cost less than the originally approved 2003 EIS/ROD alternative. $426 million is a long way from $1 billion, I’d think.

Now, let’s do some addition: the segment south of Pinhook Road includes an improved crossing of the Vermilion River, the University/Surrey interchange (pending what happens with the proposed runway displacement at Lafayette Regional Airport), and the three-level interchange with Kaliste Saloom Road. Using current values, that would probably add around $125 to $150 million to the cost. Then, you have the section from the L&D RR spur to near I-10, that would include the elevated interchange with Willow Street and improvements to the frontage road system from Donlon Avenue/Walmart Drive to Chalmette Drive, and possibly even the proposed Willow Street Circle/Gateway Arch. That would be another, say, $50 million. CSS design modifications and improvements required for mitigation would add probably another $20 million; then maybe $3 million for cleaning up the old SP railyard facility. Add all that up, and it comes to around $650 million to $700 million total.

Now, that doesn’t include the local tax commitment to local neighborhood projects that would be proposed by the ETRT/ECI/TIGER team, but that would be a local issue. With the Feds pitching 90% of the funding since this is a federal highway project involving a High Priority Corridor, the state match required would come to about $70 million.

Compare that to what the bypass proposals would cost. The LRX certainly would be less expensive due to it going around the city, right? Ahh, WRONG. The LRX would be a 60 mile long bypass extending along the perimeter of western and southern Lafayette Parish, extending even into northern Vermilion and Iberia Parish. The most recent estimates of the most preferred alignment for the LRX placed the total costs at around $1.2 BILLION dollars for a full LRX semi-loop connection from US 90 to I-49. Last time I checked, $1.2 billion was greater than $700 million. By a lot. Plus, LRX is being proposed as a tollway, funded by bonds which would be paid back through implementation of tolls throughout the facility. The Connector would be built totally “free”, perhaps with “private-public partnership” (P3) funds to ease the tax hurt, along with the rest of the I-49 South upgrade to New Orleans. (There was some early talk about tolling the upgrade of US 90, but a study showed that tolls wouldn’t even pay half of the total costs of the upgrade.)

That would leave the Teche Ridge Bypass, which is the preferred choice of darn near every single one of the Connector opponents. That is far more reasonable…but still, the truth reveals some flaws.

Teche Ridge proponents have usually quoted a 1994 “feasibility study” that was undertaken by officials in St. Martin Parish (funded by profits from casinos operating in that parish) for their belief in that alignment as a suitable alternative to the Connector. That study placed the approximate costs of that alternative at roughly $400 million for a complete bypass connecting US 90 south to I-49 north. That figure was also quoted in the affadavit filed by the Concerned Citizens of Lafayette group’s lawsuit against the FHWA and LADOTD to block the original 2003 FEIS/ROD. That affadavit was also submitted to LADOTD as an official comment to the 2003 Final EIS.

LADOTD’s response to the portion promoting Teche Ridge’s apparent cost benefit is below:

That’s $601M, not including ROW and engineering, in 2002 US$. Extrapolate for inflation and add the necessary costs, and you’re probably closer now to $700-750 million….which is nearly the same cost as what the extended and extrapolated costs of the Elevated Option concepts for the Connector freeway would cost in full.

And that’s not all, either….because Teche Ridge is not considered to be a suitable alternative for I-49 South, as is every other bypass alternative, it would require an entirely new process for feasibility and environmental study from the beginning. That’s two years for feasibility, two years for environmental and engineering, then securing funding, then getting it into the transportation program. The currently approved transportation programs by LADOTD and the Acadiana Regional Planning Commision (the official Metropolitan Planning Organization for Lafayette and the parishes surrounding Lafayette) are keyed on I-49 South using the Connector freeway and an upgraded US 90; so is the enabling federal highway legislation. To upset that by shifting I-49 South to Teche Ridge or the LRX would be at best time and money consuming; and at worst threaten to kill the entire I-49 South upgrade.

And, to make things even more problematic, there are signs that Teche Ridge isn’t even ecologically and environmentally as safe a bet as its proponents would argue. That proposal would basically traverse the thin ridge of high land that separates the Cypress Swamp/Lake Martin lowland swamp wetlands from Bayou Teche. Most of that land is now converted to farmland or remain as support for the surrounding wetland. That would pose a significant risk to such fragile and sensitive land use in the form of drainage from the freeway invading the fragile wetlands or pouring into Bayou Teche, which is a designated Scenic Waterway. The increased noise level of Teche Ridge could also disturb the flight path of endangered birds that use Cypress Swamp as relief for their annual fall/spring migrations. This would certainly raise the ire of federal and state wildlife officials. Other than the probable encroachment of the Chicot Aquifer and the possible need for some wetland acquisition for the LFT runway displacement, the Connector has really no major environmental or ecological issues otherwise.

5) The Biggest Lie of All

The final riposte of Mr. Sullivan’s letter promotes a nice vivid fantasy that if Teche Ridge….ahhh, I mean, if a freeway loop is built and highway traffic is forced to abandon the Evangeline Thruway, the latter can be reworked into a beautiful Complete Streets boulevard that will support everyone from walkers to bicyclists, and revive Lafayette like nothing other.

Funny, but that’s exactly what the Evangeline Corridor Initiative is attempting to do with the Thruway right now….with the Connector freeway in place. That theory actually works because, unlike Teche Ridge, the Connector actually will take enough traffic off the Thruway that it can be reworked to be neighborhood friendly. And, surprise…it does it without even traversing Sterling Grove or McComb-Veazey or even Freetown-Port Rico, while allowing full access and connectivity underneath the freeway structure. By contrast, unless you are planning on downgrading the entirity of US 90 back down to 2×2 and dismantling the proposed interchanges now planned or under construction, you simply are not going to remove much traffic from the Thruway even with Teche Ridge built. If you think the Thruway is a disaster now with no sidewalks or consideration for the neighborhoods with 64K VDT, imagine it reduced to 4 lanes with 90K VDT. Even the best “boulevard” will fail that test.

As for hurricane evacuation effectiveness: only Connector opponents like Mr. Sullivan can explain how diverting hurricane evac traffic to the east through a 4-lane bypass and a reduced 4-lane boulevard would be better than a direct access 6-lane elevated freeway with full shoulders which would also allow for contraflow and also include the surface-level Thruway/boulevard as a backup. Not to mention that Teche Ridge would do absolutely nothing for an evacuation of Broussard or Youngsville, nor for evacuees escaping from Vermilion Parish using US 167 north through Lafayette.

Oh, and the example that Mr. Sullivan gives for his ideal Evangeline Thruway? That’s taken from a YouTube video dated January of 2016 that was linked in his letter showing a plan for removing a portion of the I-70 corridor in Denver. There’s one small problem: that’s not the finally approved plan for that corridor. The removal (and diverting I-70 to I-270 and I-76) was considered and then rejected as too expensive and disruptive; the ultimate final solution was to bury the existing I-70 corridor under a capped tunnel and build a boulevard section above it. You know…like the ECI’s Depressed/Capped Mainline and DOTD’s Cut-and-Cover Concept 6-2.

Finally, let me conclude with this: Yes, driving interstates and highways through local poor communities in the 60’s without any consideration for the neighborhoods affected was a huge, huge error in judgement, and in some cases, a deliberate crime. However, those crimes are history, and those highways are there, serving their stated purposes of moving people and goods to where they are wanted and needed. While it is fair and appropriate to question today whether those highways can be reformed or removed, those questions should be resolved on an individual case-by-case basis, with everyone’s input and feedback involved. And, whatever alternatives are proposed must meet the desires and needs of all who use the roads, not just some planner’s wet dreams for “redevelopment” or some people’s desire for bringing back “the past”. Whether we like them or not, however ugly they may be, freeways still move people who want their cars and trucks and vehicles; maybe instead of merely tearing them down or opposing them at all costs, we might attempt to build them with everyone’s needs balanced out.

The I-49 Lafayette Connector project is the most recent test as to balancing traffic need with the desire for abutting neighborhood improvement. The most recent plans offered meet those goals of balance. It would be a shame if NIMBYism and obstructionism for the mere sake of obstruction would kill the best chance for Lafayette to both relieve their most serious traffic issue AND lay the seeds for revival of its downtown and central core. A loop will be warranted down the line, even including Teche Ridge….but the Connector is needed TODAY. Let’s work together to build it to the best way possible, and save the bypass for later.

I-49 Connector Update: Documents From 11-30-2016 Open House Meeting, Plus Final ECI Charrette Report

This will be the placeholder for any documents of significance coming from the Conceptual Design/CSS/Supplemental EIS study processes, or any other relevant activity involved in the Connector freeway process. Unless otherwise noted, all documents are taken from the official Lafayette Connector Partners/LADOTD website. All documents were generated through Scribd.com.

1)  November 30, 2016 Open House Public Meeting — Display Boards for Presentation

 

2) November 30, 2016 Open House Public Meeting — Tier II Final Technical Memo Analysis 

 

3) November 30, 2016 Open House Public Meeting — Potential Design Modifications (PDM’s) Analysis Findings

 

4) Evangeline Corridor Initiative — Final Charrette Report (with markup of proposed Elevated and Cut-and-Cover options refined by ECI/ETRT and analyzed by LADOTD & LCP) (from the Evangeline Corridor website)

 

 

 

I-49 Lafayette Connector Update: Tier II Analysis Nearly Completed, ECI Surface Tunnel Gets Stoned, Elevated Option Most Likely Solution

[NOTE: All illustrations are from the Tier II Draft Technical Memo Findings Report that was introduced to the three I-49 Connector committees on November 4th and 5th; and were posted to the LADOTD Lafayette Connector website on November 5th. The report is downloadable from that website as part of a compressed folder in the “Project Library” section under any one of the relevant committee bar tags.]

—————————————————————————————————— 

This week was a long awaited week of movement in plans towards the Lafayette Connector freeway project. The Connector Design Team , under the leadership of the Louisiana Department of Transportation and Development (LADOTD) and the Federal Highway Administration (FHWA), unveiled yesterday the notes and results of their Tier II Analysis of the 2 remaining design concepts for the central core portion of the project; and the report opened and closed many options.

In case you may have missed it: LADOTD had decided after their initial Tier I Concept Analysis back in August to further study 2 conceptual designs for the central core: an elevated freeway mainline with cross streets passing underneath and the Evangeline Thruway used as dispersion between the freeway and downtown; and a partially depressed mainline (10 feet below ground level + 10′ above for 20′ of vertical clearance) with cross streets passing over the freeway. The latter option was itself divided into two sub-concepts: an open trench with cross-street bridging, and a “surface tunnel” or “cut and cover” option where the freeway would be capped and covered with embankment allowing the cross streets to pass over the tunnel. The “surface tunnel” variation was in direct response to feedback from the Evangeline Thruway Redevelopment Team’s Evangeline Corridor Initiative (the program to reconnect neighborhoods affected by the Connector that was partially funded by a federal TIGER grant) and some in the public who wanted what they thought would be a less visually impacting corridor.

The final draft of their Tier II analysis just came in….and it doesn’t look too good, unfortunately, for the “surface tunnel” option. Based on the initial scoring and the costs, it looks more and more like the Elevated option, probably with a conversion of the existing Evangeline Thruway core section to a “grand boulevard”, will become the chosen alternative for the Connector freeway.

Before we get to the meat of the analysis, a quick review of the background.

————————————————————————————

FEIS/ROD Selected Alternative/Concept 1A & ECI Alterations

The original Selected Alternative based on the 2003 Final Environmental Impact Statement/Record of Decision is illustrated below.

Original Refinement Concept 1A, consisting of the
Selected Alternative approved through the
2003 Final EIS/Record of Decision

That concept included standalone interchanges with Johnston Street and a consolidated couplet of Second and Third Streets, a mostly elevated mainline on structure (except for a section on fill between Jefferson and Johnston Streets, railroad grade separations with the above mentioned interchange locations (along with the current Jefferson Street underpass), and maintaining the existing Evangeline Thruway one-way couplet as part of the frontage road system.

Most local officials immediately panned this alternative because, according to them, the interchanges and underpasses took up too much space that could be more useful for economic development, the filled embankment section and interchange ramps were too divisive and didn’t allow enough connectivity, and the interchanges brought too much traffic into streets that they were trying to downgrade for “Complete Streets” multimodal use (bicycles and pedestrians).

The Connector Design Team responded by opening up the process to allow for “refinements” to the design for the core segment; this produced a total of 19 concept refinement proposals utilizing 6 concepts. It was here that the ETRT and ECI attempted to intervene with their ideas for better neighborhood connectivity and compatibility with “New Urbanism” techniques of broadening mixed use development. In early August, DOTD announced that they would reduce the level of alternative concepts for their Tier 2 series of detailed analysis down to two: the Elevated Mainline (Series 4) and the Semi-Depressed Mainline (Series 6). This was also in sync with the ECI pushing out their own proposed concepts based on those two alternatives. For posterity’s sake, here are the two ECI options for the downtown core of Lafayette. (From the ECI’s September 27th Charrette Report)

The hope for the ECI was that initial testing did show their Partially Depressed and Covered Mainline to be marginally feasible, and the possibility of huge economic development gains from exploiting the space over the freeway would justify the higher costs as compared to the Elevated Mainline option.

Unfortunately, it appears that those hopes have been dashed to pieces upon further analysis by DOTD engineers.

For the last 2 months, DOTD and the Connector Design Team basically reworked and tested the Elevated, Partially Depressed/Open Trench and Cut-and-Cover designs, eventually resulting in 4 final proposed design options that were presented this week. Let’s go through each one individually:

———————————————————————————–

1) Concept 4-1: Elevated Mainline with Evangeline Thruway Couplet

There are some aspects where the Design Team did incorporate some elements desired by the ECI “TIGER Team”; they “flattened” the mainline in the area between Second Street and Taft Street so that it paralleled Chestnut Street and the Burlington Northern Santa Fe Railway (BNSF RR) line; and they did do away with the original plan of a loop ramp at Taft Street for connecting the Thruway to the southbound Connector mainline in favor of a more traditional slip ramp pair to the Thruway at Eleventh Street. In addition, the Elevated Mainline would assume a taller structure for the viaduct; only thing left to be determined would be whether a 22′ or 30′ vertical clearance would be utilized.

In Concept 4-1, the Evangeline Thruway stays mostly in its existing one-way couplet up to just past Jefferson Boulevard, where it transitions into boulevard-like facility centered on the southbound Thruway roadway, to get away from the Sterling Grove Historical District and the St. Genivieve Catholic Church. It then gets incorporated into the freeway frontage road system, but with the northbound Thruway roadway rebuilt on new alignment parallel to the mainline; the former northbound roadway would be transformed into a local two-way street (Cigg Street before the Thruway was built, maybe??)

Cross section profile for Elevated Mainline

The existing profile for the Elevated concepts allows for a 22 foot vertical clearance under the structure in order to reduce the visual impact to surrounding areas; however, there is an option to even further increase the height to allow for a 30′ clearance, which could possibly raise the height of the freeway to as much as 45′ above ground level.

I-49 Connector Elevated Profile Heights above current
ground level, reflecting both 22 foot & 30 foot verticals
Another interesting adjustment is that Simcoe Street is essentially severed across the freeway mainline in order to free up more space for mitigating the visual impact on the St. Genevieve Church property. On the west side, Simcoe traffic would be diverted to Chestnut Street and then the Second/Third one-way couplet, which would then tie back into Simcoe on the east side. There would be also a new connection on the west side using the old Dudley Avenue right-of-way to connect with Greig Street. (Dudley Ave. was absorbed by the southbound Thruway when the latter was built.)
Section of I-49 Connector Elevated Option near Sterling Grove
Historical District (Concept 4-1, with One-Way Couplet)
Also noted is that Mudd Avenue, which traverses the Sterling Grove District, is severed between the former northbound roadway/future local street and the rebuilt northbound Thruway frontage road. This is apparently to remove direct heavy traffic access from Mudd eastbound, and to further provide a continuous buffer for homes in Sterling Grove and the St. Genevieve church/school property. Mudd would still have full access to the Thruway frontage system, though, because it would pass underneath the freeway mainline to connect with the northbound roadway. 
Treatment of Mudd Avenue intersecton with
realigned Evangeline Thruway frontage system
under both Elevated concepts (severage between
new northbound Thruway and former northbound
Thruway roadway converted to local street)
The proposals from the Evangeline Corridor Initiative studying means to retain connectivity throughout the Connector freeway corridor originally recommended Mudd Avenue be retained as a continuous arterial across the freeway/frontage system, but with the portion crossing the Sterling Grove Historical District converted into a “Complete Streets” multimodal facility more friendly to bicycle and pedestrian traffic. Both Concept 4 plans differ in that they would sever Mudd between the new northbound frontage road and the former northbound Thruway roadway, which would be converted back to a local two-way street. Negotiations with Sterling Grove residents and further feedback could get that connection restored during the latter stages of Tier III analysis.
Essentially, this is Concept 4A from the Tier 1 studies, with some minor tweaking. Other than the changes around Sterling Grove and St. Genevieve, and the addition of the elevated portion shadowing Chestnut Street, it’s pretty much status quo.

———————————————————————————-

2) Concept 4-2:  Elevated Mainline with Evangeline “Grand Boulevard”

This concept is basically the same as 4-1 but with one important exception: the Evangeline Thruway one-way couplet is replaced with a tighter “urban boulevard” taking up the southbound roadway’s ROW and just to its west. The northbound Thruway in its entirity is downgraded to a two-way local street. (Clay & Magnolia Streets used this ROW before they were taken by the Thruway.) The complimentary Tier 1 proposed refinement concept was Concept 4D.

Original Refinement Concept 4D, which served as the
genesis for Concept 4-2

The freeway would be pretty much offset by one block in the downtown core area from the Thruway frontage system (whether a couplet or a boulevard); and, as I said, Chestnut Street would remain open but would be shadowed by the open freeway structure. Full access underneath the freeway would be retained. The same option for higher vertical clearance (30′ instead of 22′) would exist for Concept 4-2 as it would for 4-1, as would the same revisions for access for Sterling Grove.

Section of I-49 Connector Elevated Option near Sterling Grove
Historical District (Concept 4-2, with Boulevard)


—————————————————————————–

3) Concept 6-1: Semi-Depressed Mainline with Open Trench

This proposal is an improvement on Concept 6A in the Tier 1 study, with refinements and adjustments developed through feedback with the Evangeline Corridor Initiative group. Its main feature consists of dropping the Connector freeway mainline 10 to 12 feet below ground level, while also allowing an additional 10-12′ of vertical clearance space above ground level. This would meet the DOTD standards for 20′ of vertical space for freeway vehicles. Important cross streets would be elevated over the freeway via bridge structures.

Original Refinement Concept 6A (Semi-Depressed with
Open Trench); the genesis for Tier 2 Option 6-1

One interesting variation that was added since Tier 1 was the realignment of the southbound Evangeline Thruway roadway south of Johnston Street to pass over the mainline before Taft Street in order to align itself correctly with the southbound frontage road near Pinhook Road. This realignment requires a similar realignment of Taft Street to pass over the freeway, shifting its connection with the northbound Thruway roadway from Fourteenth Street to Thirteenth Street. Also, Fifteenth and Sixteenth Street would be severed at the Thruway to allow for the south connection ramps to slope properly.

Profile of Semi-Depressed Open Trench structure

The same evolution of the Thruway into a semi-boulevard from Jefferson to Simcoe, then to a parallel frontage road system north of there, would exist as with the Elevated option. However, the access for the Sterling Grove and Ballard Addition neighborhoods would be radically different with the Partially Depressed option due to the needed transition of the mainline from depressed to elevated to cross the Louisiana & Delta Railroad (L&D RR) spur line. Mudd Avenue would have to be completely severed across the freeway, and would be connected only with the frontage roads with no access between them. Chestnut Street would be totally wiped out, of course; so access for Simcoe would have to be switched to North Grant Street to access Second Street to cross the freeway and get to the east side. (Second and Third Streets would become autonomous two-way streets rather than a one-way couplet in this option.) Simcoe on its eastern flank would be diverted into the Dudley Avenue ROW and then turned back onto Greig Street with no connection at all to the southbound frontage road. Bellot and Tissington Streets would be the only means of cross-street access north of Second Street for Sterling Grove and Ballard Addition up to the L&D RR crossing.

Closeup view of cross-street access changes near
Sterling Grove Historic District from
Concept 6-1 (Semi-Depressed Open Trench)

But the rubber starts to really hit the road with the Semi-Depressed option (and Cut-and-Cover option as well….more on that later) with the downtown major cross street crossings and how they cross the BNSF railroad. The original Concept 6A proposal had Jefferson, Sixth, and Johnston Streets all grade separated over both the freeway and the rail line. That created some issues with the cross street railroad bridges extending past Cypress Street on the west side and disabling it as an access street; as well as issues with Johnston Street’s intersection with Cypress Street and Garfield Street, which sets the boundary for the Freetown-Port Rico neighborhood. That’s a major issue, considering that F-PR was recently made an Historical District with all the protections included.

Original concept for Tier I Enhancement Option 6A
(Semi-Depressed Mainline) showing grade-separated
overpasses of BNSF RR at Jefferson, Third, &
Johnston streets

The original 6A, as seen in the above graphic, used the original curvature of the 2003 ROD Selected Alternative, bringing the freeway close to the BNSF rail line near Johnston Street. The ECI folks, in their Charrette presentations, proposed the idea that if the curvature of the freeway mainline was “flattened” to push the apex of freeway curvature 150 feet eastbound away from the railroad, there would be enough space that the cross streets would return to ground level to cross the rail line at grade. The general idea for the ECI proposal was to have 50-100 feet of slope on either side of a 150′ mainline ROW, raised 18′ above ground level, and returning to existing level before the rail line to the west and the existing southbound Evangeline Thruway to the east. (More on why that idea fell apart for the Surface Tunnel option later on.) The original ECI Covered Mainline proposal for the downtown segment is illustrated below:

Evangeline Corridor Initiative’s original concept
for Semi-Depressed/Cut-and-Cover “Surface Tunnel”;
including “flattening the curve” of mainline
& shifting Evangeline Thruway frontage roads
to directly above/flanking covered freeway (from 10-27-16
Charrette Report)

DOTD and the Design Team, upon further study, found and reported that the concept of returning the cross streets to existing grade at the BNSF RR crossings would marginally work with the crossings at Second, Third, Jefferson, and Sixth streets. While those roadways could be returned to ground level in time to cross the BNSF/UP railroad at grade, there would be some issues with the slope of grade (nearly 7%) approaching the railroad crossings, especially for high profile vehicles. It was, though, technically feasible. Note that this option replaces the existing Jefferson Street underpass of the BNSF rail line with an at-grade crossing….for obvious reasons.

Overview of proposed Semi-Depressed overpasses of
Second, Third, Jefferson, and Sixth streets; with return
to level-grade BNSF RR crossings
Profile of Semi-Depressed option overpass of Third Street
(would also apply to Second, Jefferson, and Sixth)
Semi-Depressed (Open Trench)
cross street gradient profiles for
Downtown section
Such was not the case, unfortunately, for the Johnston Street crossing. The studies found that there simply wasn’t enough space between the depressed freeway ROW and the railroad to allow for a safe return to grade to provide a grade level crossing. 
Original profile of Johnston Street overpass of Semi-Depressed
option returning to level grade to cross BNSF RR (rejected
due to insufficient space)

Thusly, the only alternative for Johnston Street was to elevate it in order to cross over the railroad. And that’s where everything starts to fall apart. For starters, the required 23.5′ clearance over the BNSF rail line would be much higher than the clearance needed over the Semi-Depressed freeway ROW. Most important, though, is that the overpass would require an excessively steep gradient to the west of the railroad if the idea was to return Johnston to grade near the Cypress Street/Garfield Street intersection. That was important because Johnston runs right through the Freetown-Port Rico neighborhood, which was recently endowed with Historical District status, giving it special protection against any intrusion upon it. Johnston Street is also the main arterial to the campus of University of Louisiana at Lafayette, and ultimately serves as the hurricane evacuation route for Vermilion Parish. You really don’t want hurricane evacuation traffic having to traverse a 9% grade.

Original Johnston St. BNSF RR overpass profile with Semi-
Depressed option to avoid penetrating Freetown-Port Rico
Historic Distric
t

An alternative that was proposed to mitigate that situation was to raise Johnston Street and extend the structure to meet level grade at Vermilion Street to produce an acceptable gradient of 4%. That would not only require elevating the Garfield Street intersection nearly 12′ above ground and severing Cypress Street; but also elevating Lincoln Street’s intersection as well. The resulting penetration using Johnston Street would be a serious encroachment of the Freetown-Port Rico Historical District, bringing the full wrath of Section 4(f) and Section 106 violations. Nevertheless, the proposal here does include the elevated and separated Johnston Street overpass with the extended gradient.

Johnston St. profile for Semi-Depressed option
revised for sufficient gradient profile; note serious penetration
of FTPRHD due to need to elevate Garfield & Lincoln
streets.

Vertical view of intrusion of revised Johnston
St./BNSF RR overpass for Semi-Depressed
Open Trench option into Freetown-Port Rico
Historic District

You can notice also how the intersection of Johnston Street and the southbound Evangeline Thruway/frontage road has to be elevated on fill to meet the profile of the railroad overpass.

The Semi-Depressed alternative would also have some very severe ramifications for the neighborhoods surrounding the Sterling Grove Historical District as well. While the SGHD would not be impacted directly with any ROW takings with this or any other of the proposed concepts (same with the original 2003 ROD Selected Alternative), there would be some very nasty indirect impacts.

For starters, the Evangeline Thruway between the L&D RR rail spur crossing and Jefferson Street would have to be totally rebuilt and raised on either fill or structure to adapt to the standard vertical clearances required for the 10′ depressed mainline. This would mean the Thruway and cross streets would have to be raised as much as 8 to 10 feet, and the actual crossing of the mainline would require as much as a 19 foot vertical clearance. While the northbound Thruway roadway would be shifted westward further away from the SGHD (and especially Saint Genevieve Catholic Church and School, which directly fronts the original northbound Thruway roadway), the raised height would still introduce at least a strong visual impact.

Semi-Depressed Open Trench cross street
access changes for Sterling Grove/Simcoe/
Second/Third/Jefferson area
Roadway vertical profile heights for Semi-Depressed
Open Trench option (values are above ground level)
Profile gradients of cross streets & frontage system for
Semi-Depressed Open Trench option
Then, there is the severing of Mudd Avenue at its intersection with the Thruway frontage roads. Due to the need to elevate the southbound roadway to cross over the mainline, Mudd on the west side is “teed” (terminated at a T intersection) at the southbound Thruway, while its east side going through the SGHD is similarly “teed” with the realigned northbound Thruway frontage road. No access across the freeway is possible there due to the vertical clearance requirements for the mainline. Considering that Mudd Avenue is an important arterial that also carries US 90 off of the Thruway, that’s an important issue. 

Severage of Mudd Avenue due to Semi-Depressed Open Trench
option

The local cross streets from Goldman to Tissington up to the rail spur are kept open underneath the mainline (where it transitions to an elevated facility to cross the rail spur) to allow for cross access. The elevation of so many cross streets would require far more displacements and loss of access for residents, causing much more disruption for those neighborhoods.

The same would also go for the segment near Taft/Fourteenth streets, because of the realignment of Taft Street to connect with Thirteenth rather than Fourteenth, and the subsequent severing of Fourteenth, Fifteenth, and Sixteenth streets to accomodate the south connection ramps and the raised grades for the southbound roadway to pass over the mainline and connect with Taft.

Treatment of cross street access with
Semi-Depressed Open Trench option
near Taft St./Pinhook Rd. area

——————————————————————————–

4) Concept 6-2: Semi-Depressed “Cut-and-Cover” Mainline

This concept originally evolved out of Concept 6E of the earlier Design Team Concept Refinements. The original thought was that perhaps if both the railroad and the freeway mainline were shifted east a bit, the overpasses would remove the impact of at-grade rail crossings. One look at the implications of derailments of the railroad within the tunnel, as well as the impacts to access downtown, was enough to render that concept as impractical.

Original Refinement Concept 6E, which served as the foundation
for both the ECI Semi-Depressed Covered Mainline proposal
and the ultimate Tier II Concept 6-2 “Cut-and-Cover” option

However…..the Evangeline Corridor Initiative group (aka the “TIGER Team” due to the Department of Transportation grant it was bestowed upon to study integrating the Connector freeway into the community better) seized upon the burnt ashes of Concept 6E to develop their own alternative which they though could serve the same goals better. The resulting “Surface Tunnel” proposal eliminated the overpasses altogether and pushed the railroad centerline back to its existing ROW, creating enough space between the freeway ROW and the railroad to allow all the cross streets to return to grade.

Evangeline Corridor Initiative’s “Partially Depressed
and Covered Mainline” proposal

It certainly looked more than good on graphics, and it was enough for LADOTD to allow that concept to get more detailed vetting in the Tier II process. Unfortunately, the same problems and issues that affect the Semi-Depressed open trench also dissuade the Cut-and-Cover option as well…and then some.

It should be noted that the ECI propsal extended the capped/tunneled section north to include a total reconnection of Mudd Avenue, and allowed for the extension of some more local streets between Johnston and Taft streets for better connectivity. Apparently, DOTD found those to be impractical, because they don’t make their final Cut-and-Cover proposal. The cap remains set between Second Street and Taft Street, with the remainder of the mainline open-trenched.

Profile of Cut-and-Cover Tunnel structure

The same issues involving the downtown cross-street crossings with the Semi-Depressed open trench also exist with the Cut-and-Cover tunnel…but with the additional need of even higher vertical clearances to accommodate the cap. The result for the minor cross streets (Second, Third, Jefferson, Sixth, and Taft) is an even steeper gradient required to return the streets to grade to cross the BNSF/UP line. Even with that, the gradients are still marginally feasible (although, according to LADOTD, “not desirable”). Note also that, as with the Semi-Depressed open trench, the existing Jefferson Street underpass of the BNSF RR is removed and replaced with an at-grade crossing.

Downtown cross street gradients for
Cut-and-Cover option

Vertical profile for Cut-and-Cover Third St. Overpass
(applicable to Second, Jefferson, and Sixth streets as well)

Notice also that unlike the ECI Covered Mainline option where the cap returned to existing grade before the existing southbound Evangeline Thruway, this Cut-and-Cover option massively expands the embankment eastward to the point that the Thruway frontage roads have to be raised nearly 16 feet and straddled to meet the desired sloping profile. The ECI’s proposal for their Semi-Depressed Covered Mainline was to reduce the embankment on the east side that it would return to existing level grade before the southbound Evangeline Thruway, similar to the sloping on the westbound side. Apparently, that was rejected by the LADOTD engineers as too excessive a slope; instead, the embankment extends all the way to the existing northbound Thruway roadway ROW, and even takes on area east of the Thruway between Third and Simcoe streets.

Profile of proposed Cut-and-Cover Johnston St. overpass
(showing insufficient space for return to existing grade level
for at-grade BNSF RR crossing)

The same issues that befell the Semi-Depressed Open Trench option also exist here with the Johnston Street crossing; to which the same solution of an expanded railroad overpass penetrating the Freetown-Port Rico Historic District is offered.

Proposed Cut-and-Cover Johnston St./BNSF RR overpass
based on avoiding FTPRHD penetration
(rejected due to excessively steep gradient)
Revised Cut-and-Cover Johnston St./BNSF RR overpass
adjusted for sufficient gradient
(with penetration of FTPRHD)
Overview of proposed Cut-and-Cover Johnston St./BNSF RR
overpass showing penetration of FTPRHD
The resulting gradients and roadway heights:

Summary of the cross street/frontage system gradient profile
for the Cut-and-Cover concept
Summary of profile heights of roadways/embankment above
ground level for Cut-and-Cover option

And also….the same issues with cross access for Sterling Grove exist as with the Semi-Depressed option, with the same resolutions therein.

Treatment of cross street access for Cut-and-Cover option
near Mudd Avenue/Sterling Grove/Second/Third/Jefferson
(virtually same as Semi-Depressed Open Trench)

Those issues alone would be enough to dissuade the Cut-and-Cover option….but apparently that wasn’t enough for LADOTD. The Tier II Technical Memo report also gives some clear and concise detail of the potential downsides of constructing and operating the surface tunnel, as well as the high costs of maintenance and operation. There would have to be additional considerations for ventilation and egress of trapped vehicles in the event of an incident inside the tunnel. Fire suppression, lighting, and drainage would also have to be dealt with, especially in the event of a major hurricane evacuation through Lafayette. Also, due to Louisiana state law, handlers of hazardous materials would not be allowed to use the tunnel; they would be rerouted through the surface frontage road system.

———————————————————————————-

Conclusion: Comparing The Tier II Alternatives

All of this leads to the ultimate comparison: How do they stack up? The following two tables tells the tale.

First, the displacements and ROW that would be needed:

Displacement and ROW acquisition matrix for all Tier II concepts

As plainly seen, the two Concept 4 options would require less ROW than even Concept 1A (the original 2003 ROD Selected Alternative) due to the elimination of the two direct interchanges, and would have fewer displacements as well. 4-2 (with the boulevard) would use up slightly more takings than 4-1 (the couplet). The Semi-Depressed option (Concept 6-1) would be slightly worse than Concept 1A overall. The Cut-and-Cover option (Concept 6-2), though? Off the charts, with nearly three times the displacements and ROW needed due to the expanse of the embankment needed to cap the tunnel.

Even worse for the Cut-and-Cover option is that LADOTD could only acquire and pay for ROW for those areas used for “transportation purposes”, meaning that other funding sources would have to be located for any property takings outside of the immediate ROW. That would add an additional expense for LCG outside of its otherwise full commitments.

Matrix of 4(f) and Section 106 impact
to Freetown-Port Rico and Sterling Grove Historical Districts
for all Tier II Concept proposals

This is the preliminary impact matrix to the two Historical Districts that the Connector passes near. An Memorandum of Agreement (MOA) is already binding on all parties regarding mitigation for the visual impacts of Sterling Grove Historic District of the originally approved Concept 1A/2003 ROD alternative. More than likely, that MOA will be extended and modified to fit the needs for the new alternative concepts.

It’s likely that the impact will remain the same or even be sightly reduced with the two Concept 4 options, since the shift of the northbound roadway and the adjustments to the northbound connection ramps, combined with the removal of Simcoe Street, do lessen the impact to Sterling Grove greatly. Freetown-Port Rico would not be significantly affected either by the Elevated Option, save for a possible visual impact due to the height of the viaduct, especially if the higher 30′ vertical clearance is chosen.

By contrast, Concepts 6-1 and 6-2 would both require the penetration of the Johnston Street overpass over the freeway and BNSF railroad — a major penetration into the FTPRHD which would probably trigger Section 4(f) protocols for avoidance of impacts to historic properties.

Now, we get to the most important consideration: the cost.

Matrix for comparison of planning level costs for all Tier II Concept alternatives

Keep in mind that these cost estimates are only for the core section between the L&D rail spur and Pinhook Road, not for the entirity of the Connector freeway.

Finally, LADOTD made a comparison matrix rating all the Concepts they studied based on specified criteria. The results are shown below:

LADOTD Comparison Matrix for all Tier II Conceptual Alternatives

As plainly seen, the Concept 4 alternatives, due to their elevated nature, scored higher on the favorability index than the original Concept 1A/2003 ROD Selected Alternative; and both were far higher ranked than the Concept 6 alternatives. Concept 6-2 (the Cut-and-Cover concept) was universally panned for its excessive up-front costs, its high maintenance, its incompatibility with the goals of hurricane evacuation and Haz-Mat material transport, and its excessive taking of ROW and displacements as compared to the Concept 4 (Elevated) concept alternatives. Concept 6-1 (the Semi-Depressed Open Trench option) scored only less slightly worse than the Cut-and-Cover, but still got plenty of red and yellow marks.

Some advocates for the Cut-and-Cover point to the fact that while the front end costs for that option seem prohibitively expensive, the induced rewards for redeveloping the property taken near the ROW would ultimately make for a better economic return down the line. The ECI did do a study on that, claiming that there would be a $6 million a year local tax base return on overall economic development from the Semi-Depressed Covered Mainline option as opposed to the Elevated Mainline option.

Problem is, though, most people don’t think so long-term, and the sticker shock of $818 million for a 1-1/2 mile tunnel will probably be more than enough for most officials to declare the Cut-and-Cover option to be a good idea that just wasn’t good enough. The Semi-Depressed open trench option might be a bit cheaper, but the image of it becoming a flowing tributary of the Vermilion River after a heavy rainfall event may become etched enough in people’s minds to reject that, too.

Which means that it’s becoming more apparent that we are back where we were at the beginning, with an elevated I-49 Connector freeway going through the heart of Lafayette.

Unless some unforseen new environmental impact (such as the possible contamination of the former Southern Pacific Railroad rail yard, or the resolution of the Connector messing with the flight path of Runway 11-29 at Lafayette Regional Airport) was to emerge, the only remaining obstacle to the Connector’s implementation will be the legal firestorm from those opponents who want to kick this project completely out of Lafayette in favor of their Teche Ridge Bypass through St. Martin Parish. I’m sure that the Concerned Citizens for Good Government and the Greater Acadiana Sierra Club are already calling their lawyers for the inevitable second lawsuit that will be filed the day after the Supplemental ROD is delivered for this current study. We’ll just have to watch this unfold.

Building The Better Mousetrap: ECI, Signature Bridges, And The Surface Cover That Could Change The Game

The most fundamental question involving construction of the I-49 Lafayette Connector from the beginning has been this: Can a major six-lane freeway be built through the heart of Lafayette that can be integrated with the historic neighborhoods and downtown without wiping them off the map?

Many living in those neighborhoods, along with many advocates for New Urbanism, have said, “Oh HELL TO THE NO!!”, citing the history of badly planned and executed freeways being driven through inner cities without any due planning or respect for those being razed. They have been and still are the biggest advocates for swinging I-49 around the city via a bypass, while protecting the inner neighborhoods through “road diets” and reemphasis on non-auto based transportation options.

Thankfully, that attitude is being seriously challenged by a new breed of urban planning that could change the way that urban freeways are built in these areas. And, they just might have more than a snowball’s chance in Hell of executing their designs here in Lafayette.

The Evangeline Corridor Initiative (ECI) is an outgrowth of the Evangeline Thruway Redevelopment Team (ETRT), an organization founded by the Lafayette City/Parish Consolidated Government (LCG) as a go-between for redevelopment of the neighborhoods affected by the Connector freeway. The ETRT was formed under the guise of a joint agreement between LCG and the Louisiana Department of Transportation and Development (LADOTD or DOTD) to enact preliminary corridor preservation and property acquisition for the Connector project. It’s main focus, however, is to attempt to successfully integrate the Connector project with the surrounding neighborhoods and downtown in a seamless and constructive fashion that promotes both Smart Growth principles and appropriate development.

In 2014, the ETRT applied for and was awarded a $500,000 grant from the US Department of Transportation through its Transportation Investment Generating Economic Recovery (TIGER) Grant program for implementing and integrating the Connector freeway project with the community of Lafayette that would be most impacted by its construction. Their now ongoing study has the goal of not only meshing the freeway with its surroundings, but also provide more direct connectivity between the neighborhoods affected through more diverse options for transport (such as bicycles and walking); as well as improve opportunities for more suitable and better scaled economic development.

To facilitate the implementation of the project, three Areas of Influence were established for the Connector freeway:

— Area  Level I consisted of the actual right-of-way taken for the freeway facility;

— Area Level II consisted of a 500 foot buffer zone on either side of the ROW, which would serve as a transition zone between the freeway and its surrounding neighborhoods; and

— Area Level III consisted of the boundaries of the neighborhoods immediately impacted by the project.

ETRT’s and ECI’s main purpose would be to develop Area Levels II and III, and interact with DOTD and FHWA on refining Area Level I to meet their goals.

When the ECI originally announced its initial study, the assumption was that the design for the Connector would strictly follow the Selected Alternative that was approved in the 2003 Record of Decision. That alternative consisted of a mostly elevated freeway utilizing most of the Evangeline Thruway corridor, save for a segment near downtown where it would follow a gradual curve just east of the Burlington Northern Santa Fe/Union Pacific (BNSF/UP) main railroad line. Two standalone interchanges along that section with a realigned Second Street/Third Street couplet and Johnston Street would provide direct access to downtown and the neighborhoods surrounding that area; grade separated underpasses of the railroad line would prevent conflicts. Other than a brief section between Jefferson Street and Johnston Street where the mainline freeway would be elevated on embankment to account for the ramps to the two close interchanges, the mainline would be elevated for most of its entirity. Higher than usual vertical clearances (22 feet rather than the typical 16.5 feet) would be used in the segment between the Louisiana and Delta Railroad (L&DRR) spur line and Simcoe Street as part of mitigation for the visual impact to the Sterling Grove Historic District neighborhood. Also, the existing Evangeline Thruway couplet would be retained as part of a frontage road system feeding the Connector freeway and providing secondary access along with the interchanges.

Aerial profile of I-49 Lafayette Connector Selected Alternative, based on
2003 Record of Decision and 2007 Conceptual Study

However, when the Conceptual Study was revived in October of 2015, those assumptions quickly were rendered useless. There was the historical strong opposition from those who opposed building the freeway through Lafayette from the very beginning, preferring a bypass alignment to the east such as the Teche Ridge Bypass or the Lafayette Regional eXpressway (LRX) alternative to the west.

However, a different form of opposition soon emerged from downtown interests who did favor the central alignment, but begged to seriously differ on some of its details. The Lafayette Downtown Development Authority (LDDA) was particularly not so keen to some elements of the Selected Alternative; and their objections were reinforced through both the public involvement process of the main Conceptual Design Study and the initial meetings of the Evangeline Corridor Initiative through their innovative “charrette” meetings. The main objections were:

1) The two standalone interchanges with the Connector at Johnston Street and Second/Third Streets took way too much right-of-way that could be used for development, and were unnecessarily divisive for connectivity.

2) The embanked segment of the mainline between Johnston Street and the Jefferson Street underpass was too divisive, and severed an important collector (Sixth Street/Lee Avenue).

3) The Second/Third Street couplet interchange/railroad underpass potentially forced too much traffic onto Congress Street (which the couplet directly fed into), which contradicted plans for remodeling the latter as a “Complete Streets” prototype for pedestrian/bicycle access and slowing vehicle speeds. It also potentially impacted the Coburn Building, an old retail shop that had recently been approved into the National Register of Historic Buildings.

In reaction to those objections, LADOTD was induced to add a six-month period where modifications to the Selected Alternative could be proposed to address these needs. While the alignment remained the same as to not disturb the concept approved by the 2003 ROD, tweaks to the system of access were proposed, ultimately resulting in 19 design “refinement” modifications by May of 2016.

The ECI study was conceived to run parallel with and advise the DOTD study, and to provide some form of feedback for addressing the Joint Use and greenspace requirements for the freeway. Originally, the idea was that ECI would serve only to perform the development of design for Levels II and III…but as the ideas kept rolling in, it was becoming apparent that they should intervene with DOTD to offer up their own alternative designs more suitable to their goals. In the end they settled on two main concepts, both based on concepts developed by DOTD, but with their own alterations.

Elevated Mainline with Signature Bridge

Overview of Elevated Mainline with Signature Bridge
concept from Evangeline Corridor Initiative
(from ECI Draft Charette Report)
DOTD Concept 4D (Evangeline Parkway), the genesis of ECI’s
Elevated Mainline with Signature Bridge design




Generally based on the Series 4 concept from DOTD, this alternative design entailed a continuous elevated structure along the length of I-49 from the Chalmette Drive crossover all the way to the Vermilion River crossing (or even the University Avenue/Surrey Street crossing). The effect would be more of a large scale land bridge crossing Lafayette, with the peak of the crossing designed as a “signature bridge” landmark that would define downtown Lafayette. Instead of direct interchanges downtown, access would be provided through direct connection “slip ramps” to a redefined Evangeline Thruway frontage system, with the slip ramps placed between the L&DRR and Mudd Avenue for north access, and between Pinhook Road and the Vermilion River crossing for south access. The Evangeline Thruway southbound roadway would be reformed as a six-lane urban boulevard for local business development; the northbound Thruway roadway would be downgraded to a two-way local street and returned to the local grid for the McComb-Veazey neighborhood. Accessibility and connectivity would be improved and restored underneath the “signature bridge” by adding additional cross streets over the BNSF/UP railroad, and restoring some one-way streets to two-way for refining the downtown grid. The space immediately under the bridge structure would be developed for public parking and green park space.


Semi-Depressed Mainline with Cover (Surface Tunnel)



This concept was actually not included in the 19 design modifications put out by DOTD, but is a modification by ECI of one that was included. Part of the Series 6 concepts, this was originally developed thanks to input from an unnamed constituent who noted that an original concept of a depressed Connector freeway was vetted and rejected in the early studies. That concept would have depressed the mainline freeway 20 feet below ground level within the median of the the entirity of the Evangeline Thruway. While it was ruled to be marginally feasible, it was rejected out of practicality and the need for I-49 as a hurricane evacuation route. The constituent suggested that maybe a partially depressed freeway would work better; and studies did confirm initially that a 10 foot drop would better allow for gravity drainage.

The Series 6 concept designs are based on dropping the elevated segments from just south of the L&DRR spur overpass to Pinhook Road down 10 feet below ground level, and adding 10 feet of vertical clearance, for a total of 20 feet. Crossing streets would then be allowed to pass over the freeway for connectivity. The first concept (6A) called for an open trench; subsequent concepts added the cover for a partially submerged tunnel effect.

The ECI Covered Semi-Depressed Mainline alternative is an adjustment to LADOTD’s Concept 6E, which originally called for flattening the curve of the mainline freeway and also shifting the alignment of the BNSF/UP rail line 150 feet east of its current ROW and dropping it to the same level as the freeway. All ECI did was to return the rail line back to its current trajectory, but keep the shift of the freeway centerline so that the resulting berming over the freeway tunnel could return to existing grade prior to the rail line. This allowed all the crossing streets to retain at-grade crossings of the railroad, removing the need for overpasses.

The other striking feature of the Semi-Depressed/Covered Mainline alternative is that the Evangeline Thruway is essentially replaced altogether with an avenue/boulevard hybrid built directly on top of the tunneled mainline segment, and accessible through the same “slip ramp” connection system as the Elevated Mainline uses. The original Thruway roadways would be downgraded to local streets within the neighborhood grid. (There is an option that utilizes both the avenue on top and the boulevard on the side.)

Initially, DOTD balked at including ECI’s alterations to their Series 6 options in their initial analysis, citing both the protocol of DOTD handling Area Level I and that the time for entering concept modifications had passed. Under strong pressure from LCG officials insisting that the alterations be added (as a new concept “6F”), DOTD partially relented and allowed for consideration of the ECI alterations to 6E, provided that that series passed the initial Tier I analysis…which it did by August 2016. All of the modifications under Series 4 and 6 are now currently under a more involved Tier II analysis by DOTD, which will result in the culling down to three finalist alternatives by the end of October, and a final selected and approved alternative by the end of December.

Reinventing Lafayette Gateway North…The Arc d’Willow???

Another goal of the ECI study was to find new ways of exploiting the Connector freeway to redevelop neighborhoods that had been struggling to rise economically. The Lafayette North Gateway District is one distinct example. Once a center of activity through Northgate Mall, Albertsons’, and Walmart, North Lafayette along the Evangeline Thruway has suffered greatly economically, and it is accelerated by the lack of through access due to the nature of the at-grade Thruway.

The original concept for the Selected Alternative in this area was to integrate the Evangeline Thruway into the frontage road system as traditional one-way frontage roads, with a slip-ramp diamond interchange at Willow Street and underpass connections at Martin Luther King Drive/Castille Avenue and at Donlon Avenue/Walmart Drive. The Gateway Visitors Center within the median of the Thruway would be removed and relocated to make room for the Willow Street overpass/interchange.

Needless to say, the ECI folks took one look at those plans and announced: “Ummmm…nope. We can do much better than this.” And this was the result:

The second most distinct feature of this refinement is the radical transformation of the Willow Street interchange. No more slip ramp diamond; now it’s a huge circle interchange with the ramps from I-49 connecting directly to the circle rather than the frontage roads. The MLK/Castille and Donlon/Walmart intersections are now smaller circle/roundabouts, too, and all connected with two-way local streets fronting houses and mixed-used development. Both the Northgate Mall and Walmart properties are also transformed into mixed-use/smaller business development as well.

I did say second most distinct, right? For #1, you got to look what’s inside the Willow Street Circle. Behold, behold…the Arc d’ Lafayette!!

Yes, that would be a 60 foot imitation of Paris’ Arc d’Triomphe straddling the Connector overpass of Willow Circle, complete with a new home for the Visitors’ Center and an observation deck on top. This is what you call “thinking outside the box”.

All of this may seem quite expensive and beyond the reach of funding for the Connector freeway, but considering the alternative of not completing I-49 South or having it diverted around Cypress Swamp and St. Martinville and Breaux Bridge for no benefit, I’d say that this deserves more than just a look.

The I-49 Lafayette Connector and Lafayette Regional Airport: Myths And Reality

One of the many impacts that the I-49 Lafayette Connector freeway project would impose on the city of Lafayette would be a displacement of Runway 11-29 at Lafayette Regional Airport (LFT). This is due to the proximity of converting the existing intersection between the current Evangeline Thruway and East University Avenue/Surrey Street into a grade separated overpass/interchange. The resulting overpass crossing University/Surrey would penetrate into the direct flight path of aircraft entering and departing Runway 11, violating slightly the Runway Protection Zone glide path. The overpass would add about 15 feet of additional height that would need to be cleared along the glide path of Runway 11-29.

In order to raise the glide path to safely avoid the overpass, the proposal is to extend Runway 11-29 by 350 feet at its eastern end, shifting the western end of its approach by that length. This would conceivably provide enough of a graduated slope to clear the overpass and the required 17 foot safe zone above the highest height of clearance. The existing eastern end would not be removed, just remain as sort of a dead zone.

The runway extension would require the acquisition of some wetlands at the eastern end in order to raise the grade level, but the amount of wetland acquisition would be less than 5 acres, and would be within the existing property controlled by the airport.

Aerial view of Lafayette Regional Airport with
proposed displacement of Runway 11-29 to conform with
proposed I-49 Lafayette Connector freeway
(via Lafayette Connector website)

The Louisiana Department of Transportation and Development (LADOTD) and the Federal Highway Administration (FHWA), who are the lead agencies for the Connector freeway project, have had constant and consistent discussion and interaction with the Federal Aviation Administration (FAA) concerning the potential impacts of the runway extension. FAA gave their initial approval to the current alignment and LFT adjustments as stated in the FHWA Record of Decision (ROD) in 2003 (downloadable here), and then authorized and approved their own standalone ROD for the airport modifications in 2008. (The full FAA ROD is downloadable here (pdf document).)

Due to recent changes in FAA regulations for wetland mitigation and construction standards, the current I-49 Lafayette Connector Conceptual Design Study and Supplemental Environmental Impact Statement (SEIS) process does include a reconsideration of modifications to the University/Surrey interchange to mitigate or avoid the need for the runway displacement. It is more than likely, however, that the displacement will be retained due to conditions that restrict modifications to the University/Surrey overpass.

Nevertheless, such developments haven’t stopped opponents of the Connector freeway, who would much rather it be diverted to a bypass around the city, from decrying the possible impacts of the displacement.

One such devout critic is Michael Waldon, whom has dedicated an entire blog (Connector Comments) to documenting his opposition to what he calls “the Con”; and his belief that this freeway project would be the worst thing to happen to Lafayette. I respect his right to oppose this project, but when his arguments are reduced to disassembled claims and distortions of facts, there is a need to correct the record.

And in the case of Lafayette Regional Airport, Mr. Waldon is, as we say, way, way off.

The main thesis of Waldon’s blog post challenging the Connector freeway and the LFT Runway 11-29 displacement falls upon the theory that the 350′ displacement understates by a factor of three the need for a much longer and more destructive runway extension. Essentially, he rips upon the proponents of the Connector for building their project with no concern for “building tall structures next to your airport”. Here’s how Waldon summarizes his beef with Connector proponents:

SUMMARY: The I-49 Connector FEIS identified unacceptable risk due to failure to meet FAA flight path obstruction guidance, resulting from the proposed interchange construction adjacent to the Lafayette Regional Airport. Without documenting calculations or rationale, the FEIS stated that in order to meet these minimum safety requirements, airport runway 11-29 would need to be displaced 350 feet southeast toward Bayou Tortue and the Cypress Island Swamp.

My calculations, based on FAA guidance, arrive at runway displacement considerably longer than that presented in the FEIS. Here, following FAA guidance, I calculated that the required displacement is 860 feet. This significant difference brings into question the economic, environmental, and engineering feasibility of the displacement. Impact of this displacement on flooding, wildlife, and wetlands should be carefully addressed and documented by DOTD.

The public attitude toward airport safety should always be conservative and circumspect. The Airport’s 1975 Master Plan concludes “Conditions at the airport’s periphery make expansion of its land area difficult or expensive or both.” Even beyond the impacts of runway displacement discussed above, it is simply inappropriate to choose to construct any tall structures on the periphery of our airport which is already severely constrained at its location. Tall structures like the University and Kaliste Saloom interchanges constrain future airport runway alignment adjustments, and impact the ability to meet current requirements and future safety requirements should FAA guidance on safety margins or approach slopes change for any reason.

Let’s analyze Waldon’s objections more closely, shall we?

The interchange closest to the glide path of Runway 11-29, as noted, is the University Avenue/Surrey Street interchange. Under the proposed Connector profile, I-49 would cross over University/Surrey at a maximum height of 16 feet, sloping downward to grade level right near where the flight path of Runway 11 crosses the US 90/Evangeline Thruway/Future I-49 right-of-way. The 11-29 glide path parallels and is 200 feet to the south of the Surrey/University centerline. With the adjusted RPZ glide path, the “end” of Runway 11 would be adjusted 350 feet further down from the current endpoint. This picture (from Waldon’s blog) summarizes the adjustment with respect to the current Thruway and Surrey/University.

Overview of Lafayette Regional Airport Runway 11-29,
with adjusted endpoint for displacement (yellow line) and
half of the Approach Surface. (via Connector Comments blog)

Seems foredooming, right? Except, this overview completely ignores the vertical profile. Here is the profile that Waldon uses for his post, taken from the 2002 I-49 Connector Final EIS (downloadable from LADOTD’s Lafayette Connector website here(Vol. 1) and here (Vol. 2)), which he uses for his argument of fear of planes crashing into the University/Surrey overpass.

Vertical profile of I-49 Lafayette Connector alignment
at University/Surrey interchange near LFT (from 2002
Final EIS, via Connector Comments blog)

You can see that the Runway Protection Zone minimum is set at 17 feet above the highest object height; which would put it generally at approximately 30 feet above the ground level of the runway at the point where the 11-29 glide path intersects with the Connector overpass. The RPZ is also sloped slightly to adjust to the slope of the grade of the overpass, thusly extending the RPZ height to cover the overpass as well.

However, that might even overstate slightly the impact to LFT. Here’s a much more recent profile of that section of the Connector freeway, based on the approved Selected Alternative, that was developed in 2007 during the initial Corridor Conceptual Study.

Profile of I-49 Lafayette Connector @ University/Surrey
interchange (from 2007 Conceptual Study, via
Lafayette Connector website)

As you can plainly see, the University/Surrey overpass is now a bit less steeply graded, and the University/Surrey centerline profile is depressed a bit; this must have been to reduce the height of the overpass as to relieve the penetration of the glide path. But, the height in general remains the same: roughly 30′ counting both the height of the overpass and the maximum clearance of 16 feet for vertical clearance for vehicles using the freeway mainline.

It is here where Waldon goes off the cliff. First, he sets up the measurements for FAA and FHWA standards, which is accurate enough.

Finally, it is necessary to estimate the height of objects above the roadway. This could include signs, streetlights, and aircraft warning lights. The FEIS does mention this, and suggests that special signage and lighting may be necessary. Thus, I will assume that the height of the vehicles on the roadway will be the tallest objects above the roadway. There is no Federal vehicle height requirement for commercial motor vehicles (CMVs). Most eastern states, including Louisiana, set a CMV height limit of 13.5 feet on most highways. Louisiana does allow heights of 14 feet on designated highways, and oversize permits can be routinely issued for heights up to 16 feet 5 inches. Without specific guidance from the Louisiana DOTD, it is unclear what height should be assumed. Here, I will simply assume a maximum height of 15 feet for all vehicles and objects on the roadway.

It should be noted that while Louisiana doesn’t have specific height requirements for vehicles using its roadways, Federal Interstate standards do require minimum height restrictions of 16.5 feet for overpasses of freeways, and 20 feet of clearance for covered/tunneled sections. Since the Connector will be an Interstate built as part of the I-49 South extension to New Orleans, I can assume that it will be built to those standards.

Assuming the peak height at the interchange structure controls the required runway displacement, the calculation of length for the approach surface is now straightforward.  The interchange height plus object height has an elevation of 60 feet (45+15). Adding the FAA 17 foot margin of safety gives a total elevation of 77 feet. Subtracting the runway height which defines the primary surface elevation then gives a height of 40 feet (77-37). At a slope of 34:1, the length of the approach surface to the primary surface is 1,360 feet (34×40). At this point along the approach surface, the approach surface width is 1408 feet (1000 + 0.3×1,360), or 704 feet on each side of the extended runway center-line (Figure 3). Adding the 200 foot width of the primary surface at the end of the runway gives a total distance form the peak of the interchange of 1,560 feet. The present distance is estimated to be 700 feet, so the total runway displacement required would be 860 feet (Figure 4). This is 510 feet longer than the value asserted in the FEIS. This difference significantly brings into question the economic, environmental, and engineering feasibility of the displacement.

The highlighted portion of Waldon’s quote gives his game away. 60 feet??? Really? But, I thought that the height of the University/Surrey overpass was only 12 to 15 feet; how did Waldon get to 40 feet? Simply, he gets his interchanges mixed up. The adjacent Kaliste Saloom Road interchange with the Connector freeway and the frontage roads does indeed include a 40 foot high ramp that is needed to clear the freeway mainline, the adjacent BNSF/UP railroad line, and another high ramp. There is one slight little problem, though; the Kaliste Saloom interchange is nearly 3,000 feet away from the RPZ glide path of Runway 11-29; and the offending ramp drops down to grade level to split to connect with both the northbound Connector mainline and the northbound frontage road long before it gets to the Runway 11-29 flight path. Here’s an overview, straight from the 2007 Conceptual Study:

Aerial profile of I-49 Lafayette Connector @
Kaliste Saloom Road & University/Surrey
interchanges & LFT (from 2007 Conceptual
Survey, via Lafayette Connector website)

As plainly seen from this profile, the Kaliste Saloom ramps are so far away from the Runway 11-29 glide path that it would take some very, very, very bad aircraft control for any plane to even threaten to hit even the highest overpass.

But, it doesn’t stop Michael Waldon from using the Kaliste Saloom ramps for his equation which concludes that a much steeper gradient for 11-29 would require a much longer runway displacement (860 feet, compared to the 350′ proposed in the ROD). This would require a much longer extension of 11-29 that would not only consume far more wetlands, but potentially threaten Bayou Tortue, a tributary that sets the boundary between the airport property and the surrounding wetlands. This is the proof that, in Waldon’s eyes, disqualifies the Connector as a valid alignment, and justifies his belief that a bypass would be much better for Lafayette.

If we adjusted Waldon’s measurements to reflect the reality of the University/Surrey overpass rather than his fantasy of placing the Kaliste Saloom ramps in front of the airport, they would be as follows:

Interchange height (16 feet) + maximum surface height (16 feet) = 32 feet (compared to 55 feet)

Add FAA 17 feet clearance zone = 49 feet (compared to 77 feet)

Subtract 37 feet for primary surface elevation height: 49 – 37 = 12 feet (compared to 77 -37 = 40 feet)

Length of approach surface to primary surface, using 34:1 slope: 12 * 34 = 408 feet (compared to 1,360 feet)

Add 200 feet overrun = 608 feet (compared to 1,560 feet)

Account for current 700 foot length of Runway 11-29: 92 feet of existing leeway (compared to shortage of 860 feet)

In other words, the existing Runway 11-29 is actually marginally suitable for adjusting to the glide path changes from the University/Surrey overpass, but it would be a rather tight fit. The 350 foot runway extension/displacement would certainly add the necessary margin of safety, and would be the maximum allowed that would least impact the adjacent wetlands and Bayou Tortue.

As I mentioned before, the recent changes in FAA regulations regarding construction of runways over wetlands has prompted the FHWA and LADOTD to reconsider modifying the University/Surrey overpass to possibly avoid displacing the RPZ glide path. (Listed as Potential Design Modification #10; the full list of proposed modifications can be found here.)Such a study, though, does not avoid the basic fact that, even with the wetland impact, the runway displacement would not be anywhere near the destroyer of Lafayette that folk like Michael Waldon would assume it to be.

The Great Debunking Of The Teche Ridge Bypass: Why It Is NOT The Alternative To The Connector Some Would Argue

Map of proposed I-49 Lafayette Connector freeway

The group of people who are opposed to the I-49 Connector freeway project through Lafayette have always tended to build their case around an alternative alignment referred as the Teche Ridge Bypass, which would revert the proposed Interstate highway to the east of the center of Lafayette through St. Martin Parish, then reconnect with existing I-49 generally east of Carencro. Their argument has always been that Teche Ridge would be much cheaper, would avoid the displacements and divisions that the Connector alignment using the Evangeline Thruway/US 90 corridor would allegedly ensue, and could be built in “half the time” for “half the cost”.

With all respect to these people, who’s legitimate concerns about the impact of the Connector are worthy of addressing, I will show here why Teche Ridge is not as much a slam dunk solution to finishing I-49 through Lafayette. Indeed, a closer investigation will find that it is more of an airball.

First, a brief history summary lesson: In 1993, after the first I-49 Connector environmental study was terminated before a Final Environmental Impact Statement could be produced, the Lafayette Metropolitan Planning Organization (MPO, at that time called the Lafayette Areawide Planning Commission) paid for the Lafayette North-South Corridor Study, which analyzed 4 alternative corridors for completing I-49 through Lafayette. One circled around metro Lafayette to its west and south (Western Bypass); two bypassed Lafayette to the east (Eastern Bypass ran from just north of Carencro to near Breaux Bridge to link up with US 90 just north of Broussard; Eastern Alignment was similar to Eastern Bypass but shifted its connection to I-49 North to just south of Gloria Switch Road); and one used the Evangeline Thruway/US 90 corridor. A map of the LN/SCS alternatives studied appears below:

Corridors for Lafayette North-South Corridor Study (1993)
Full report downloadable by clicking on link.

That study concluded that the Evangeline Thruway corridor was still the most desirable and cost-efficient choice for extending I-49 due to environmental factors and traffic counts. Their analysis reported that since only 11% of traffic on the Thruway/US 90 corridor was traffic bypassing the city of Lafayette, a bypass would not attract or divert enough traffic from the central corridor to be cost effective; and there would also be enormous environmental impacts on wetlands and sensitive tributaries (such as Cypress Swamp and the Vermilion River).

It was soon after that study was released that opponents of the Connector decided to search for another east bypass alternative that would be more suitable for their needs; by 1994, it appeared that they had found it when the St. Martin Parish Police Jury contracted out the engineering firm of Baker and Associates to perform a “feasibility study” on a new bypass route. It was dubbed the “Teche Ridge Bypass” because it followed the Couteau-Teche Ridge that overlooks the Bayou Teche and Vermilion River basins; running between Cypress Swamp and Bayou Teche basin. A rendering of the proposed Teche Ridge Bypass taken from that study appears below:

An overview of the I-49 Teche Ridge Bypass alternative,
from the Baker and Associates study.
(via the I-49 Teche Ridge Facebook page)

 Since then, Connector opponents have been pushing Teche Ridge as the go-to “common sense” alternative to avoid the “mistakes” of building the Connector through “the heart of Lafayette”. Under actual analysis, however, their arguments turn out to be wishful thinking at best.

First off, let’s deal with the cost issue. Teche Ridge proponents are always pushing that their bypass will be significantly cheaper to construct than the Connector (or, as they derisively call the central alignment, “the Con”). The initial quote given by the St. Martin Parish study gave a raw total cost of $400 million for construction of the bypass; which would roughly compare to the estimate of $350 million quoted for construction of the 5.5 miles of the Connector from I-10 to just south of Lafayette Regional Airport. The section just south of the airport to the US 90/LA 88 interchange is covered by another project linked to the entire US 90 to I-49 South upgrade. That section had an projected cost of $350 million; which would make the combined cost of the overlapping portions of the central corridor $750 million. That would appear to justify the Teche Ridge advocates’ claim of their alignment being cheaper.

Or, so they think.

The group Concerned Citizens of Lafayette teamed up with the Greater Lafayette Sierra Club to file a lawsuit against the Louisiana Department of Transportation and Development (LADOTD) and the Federal Highway Administration (FHWA) to block implementation of the 2003 Record of Decision approving of the currently proposed I-49 Connector freeway alignment. In their lawsuit, they explicitly promoted the Teche Ridge Bypass as a superior alternative to the approved corridor, citing costs and less negative impacts. Part of their case came in the form of an affidavit that they sent to LADOTD as a elongated comment response to the Final Environmental Impact Statement (FEIS) that was released in October 2002 prior to final approval in the ROD. Here is one paragraph of Concerned Citizens’ affidavit where they defend Teche Ridge:

LADOTD, in their 2003 I-49 Connector ROD, offered this series of responses to the Concerned Citizens’ brief, which calls directly into question those arguments.

Keep in mind that that was $601 million in 1993 US dollars; you would have to adjust accordingly for inflation to reach the current value for the Teche Ridge Bypass, which would probably bring the total to around $700-750 million. And, that would not include the costs of improvements that would still be required along the US 90 corridor to meet the traffic needs that Teche Ridge would fail to address because it would not attract traffic away from the Evangeline Thruway/US 90 corridor.
Most recently, opponents of the I-49 Connector and backers of Teche Ridge have used the current estimate of the costs of building the Connector freeway based on the now currently ongoing Corridor Conceptual Design Study as a wedge to push their favored bypass. They use the currently quoted estimated cost of $750 million to $1 billion as a wedge in their favor…except that that estimate doesn’t necessarily reflect the actual construction costs, but rather the amount of revenue that LADOTD has estimated they could get allocated for the project through Federal and state funding. Furthermore, there has still been no true official feasibility study of the Teche Ridge route to analyze its true economic and social impacts on its path, which would involve its own issues of sensitive wetlands and displacements as well. 
Future posts here will debunk the exact claims that the Connector would do permanent damage to Lafayette such that only a bypass would be sufficient. For now, though, a discussion of the fundamental flaws of Teche Ridge will suffice.
(to be continued)

Introduction: Building A Better Connector For Lafayette

First off, a disclaimer: I represent no one but myself, and my opinions here are strictly my own. They do not reflect anyone from the Louisiana Department of Transportation and Development (LADOTD), the Federal Highway Administration (FHWA), the Lafayette City/Parish Consolidated Government (LCG), or any agency affiliated with the I-49 Connector Partners design team or that of the Evangeline Thruway Redevelopment Team’s Evangeline Corridor Initiative (ECI). All official inquiries about the Connector freeway project should be deferred to the official Lafayette Connector website,  DOTD, FHWA or LCG.

I have been a supporter of the process of building a freeway within the Evangeline Thruway corridor in Lafayette for most of my lifetime, and I have seen the progression of the development of this project from its initial conception during the 1980’s to the current Conceptual Design Study now ongoing.

The process for implementing the I-49 Lafayette Connector has been inching along in a jerky fashion: from the aborted 1992 Draft Environmental Impact Statement (EIS), to the 1993 North-South Corridor Study, to the 2003 Final EIS, approved with a Record of Decision, to the original Conceptual Design Study that started in 2007 but was terminated in 2008. Along the way, the process has met with organized and passionate opposition from many citizens and organizations who fear that the implementation of the Connector would further divide and destroy the inner fabric of Lafayette. Most of them have promoted as an alternative a loop bypass called the Teche Ridge Alternative, which would run to the east of Lafayette proper generally along the Coteau-Teche Ridge plateau above the Bayou Teche and Vermilion River basins through St. Martin and eastern Lafayette parishes.

The promoters of Teche Ridge contest that that alternative would complete the extension of Interstate 49 from Lafayette to New Orleans at far less a cost fiscally and environmentally than the Connector would. They even went as far as to file a lawsuit after the initial Record of Decision for the Connector project’s current alignment was approved in 2003; but their suit was thrown out by U. S. District Judge Tucker Melancon in 2004; that decision survived an appeal to the U. S. Fifth Circuit Court of Appeals later that year.

The current Conceptual Design Study and Preliminary Design process was restarted in October 2015, using protocol and conditions set forward through the Joint Agreement between DOTD, FHWA, and LCG that was signed in 2002 as a precondition to the ROD, Originally, this process was supposed to simply reconfirm and implement the preapproved 2003 Selected Alternative (RR-4 with MPO Subalternative and Subalternative H), with additional Context Sensitive Solutions (CSS) design integrated into the entire alignment to fulfill the requirements of full integration and connectivity within the neighborhoods affected within. In the midst of sharp concerns from some local community  interests about the divisive impacts of some elements of the Selected Alternative, however, the Connector Design Team decided to open the floor for “refinements”; i.e., modifications to the Selected Alternative that would mitigate these concerns. As a result, 19 refinement concept modification proposals and 23 design modifications were proposed and either were or are now being analyzed as modifications to the original alternative.

In addition to that, the FHWA, in the midst of performing an Environmental Reevaluation of the 2003 Record of Decision, which is required for any major project where over 3 years had passed since a ROD was approved, determined that a Supplemental Environmental Impact Statement (SEIS) was the appropriate protocol and review for these refinements and potential modifications. That process was initiated in August of this year, and will produce an amended ROD by at the latest the spring of 2018.

Another player in this was the Evangeline Thuway Redevelopment Team (ETRT), the organization entrusted by Lafayette Consolidated Government with the job of incorporating the Connector freeway design with the neighborhoods and downtown sections that would be bisected by the project. In 2015, ETRT applied for and was awarded $500,000 from the US Department of Transportation through their Transportation Investment Generating Economic Recovery (TIGER) grant program, for the purpose of expanding and maintaining connectivity and neighborhood-appropriate economic development for the Evangeline Thruway/Lafayette Connector corridor. The Connector would take most of the Evangeline Thruway for its right-of-way, only deviating for a 2 mile section on new alignment between near Simcoe Street and just north of Pinhook Road. The Evangeline Corridor Initiative (ECI) was the functional organization for these efforts, and their studies yielded two particular design concepts for the downtown portion of I-49:

  • Elevated Mainline with Signature Bridge: in which the freeway would be fully elevated throughout the downtown area with no standalone interchanges, but with the existing Evangeline Thruway modified (perhaps converted to an urban boulevard) to serve as the access for downtown connections and major streets; the viaduct would be raised to a maximum of 40 feet above ground level and enhanced with CSS concepts as green space, park space, maximum joint use with pedestrian/bicycle access, and parking; and with considerations for appropriate development within the corridor.
  • Partially Depressed And Covered Mainline: in which the Connector freeway mainline would be sunk 10 feet below ground level and given another 10 feet of vertical clearance above ground, for a total of 20 feet of vertical clearance; then completely covered in the form of a partially submerged tunnel, with berm treatment on both sides using 100 – 150 feet either side with 6 percent sloping allowing for cross streets to pass over the “tunnel” for connectivity; and allowing for development via mixed use on either side of the mainline freeway accessible through an avenue/boulevard setup flanking or on top of the mainline structure. (There is also an option for the boulevard using the existing Thruway ROW.)

I will cover more about the ECI options in future posts, as well as why I favor the Partially Depressed and Covered option as the best solution for implementing the Connector through Lafayette. For the moment, though, there is the matter of some of the arguments that are currently being made against the Connector by the very same people who have been opposing the alignment through Lafayette from the very beginning. In particular, the Greater Lafayette Sierra Club has been in the forefront of efforts to kill the Connector project and replace it with a bypass — mostly, the Teche Ridge bypass, but also the proposed Lafayette Regional Expressway (LRX) outer tollway loop that would go south and west of Lafayette. Their Y-49 and Teche Ridge Facebook pages state their cases quite adequately, as well as this blog formed by a well known and very outspoken opponent of the Connector freeway.

I do not in any way wish to demean Michael Waldon, Harold Scheffler, or any of the other opponents whom have advocated against the Connector freeway, nor do I want to diminish in any way that this project will indeed have some major impacts and much dislocations for people within the city of Lafayette. They have every right to speak their mind and offer critique and promote their alternatives. What I intend to do is to just as respectfully counter their arguments and refute their claims about the Connector having a negative impact and the Teche Ridge alternative being a suitable alternative. I intend to make the counter claim from my own perspective and using fact and detail that the Connector freeway, with the modifications and alterations proposed by the ECI and a few proposed by myself, can be and is the best alternative for completing I-49 through Lafayette.

References, unless explicitly stated otherwise, will use all of the historical documentation of the I-49 Lafayette Connector freeway project as listed in the Project Library section of DOTD’s Lafayette Connector website.